How to Replace Touchscreen on Red Lion G3 Series HMI

Question:

Has anyone had experience replacing a touchscreen on a Red Lion G3 series HMI from the past? Have you encountered this issue before and found a solution?

Top Replies

Are you interested in converting from G3 to Graphite controllers? In Crimson 3, there is a convenient feature for this purpose. However, it is advisable to verify the availability of Graphite screens, as there were delays in production during the COVID-19 pandemic.

Do you have an old and worn-out Red Lion G3 HMI that needs a touchscreen replacement? Look no further than eBay, where thousands of affordable options from China are available for purchase. Have you ever considered upgrading your old, scratched, and dysfunctional touchscreen with one of these replacements? Share your success stories and experiences with us!

Several years ago, I had to send a malfunctioning backlight power supply to Red Lion for repair. They were not only quick and cost-effective, but they also fixed a water-damaged G10 HMI in under a week for less than $500. I'm uncertain if they still provide repairs for outdated HMIs, but their service was impressive.

Hello OkiePC, Red Lion does not repair legacy items unless they have the necessary parts. However, I prefer to handle the repairs myself. It can't be too difficult to remove the damaged components and replace them with new ones. I am specifically referring to replacement parts that are widely available from various suppliers, such as touchscreens, front windows with soft buttons, and other similar items. It is likely that these parts were originally manufactured in China and are now being sold by suppliers to meet the demand for restoration in the US. Have any of you purchased these replacement parts and successfully installed them?

I have never worked on that specific HMI model before, but I have replaced many others in the past. For example, we had a Siemens 17" TP HMI that was obsolete. When removing it, we had difficulty as it was stuck on with double sided tape. After reaching out to the manufacturer for a replacement, they directed us to one of their resellers who had two units available for £50.00 each, a much better deal than the £3,500 OEM price for a spare HMI. I have also replaced a number of Beijers E series HMIs, including the keypads, with ease. In some cases, I even upgraded the backlight to LEDs and powered them from a 24v supply to ensure functionality. The ease of replacement varies depending on the construction of the HMI, with some being straightforward and others presenting challenges that could potentially damage other components during removal.

Yes, I've had some experience with replacing a touchscreen on a Red Lion G3 series HMI. A crucial point is to ensure the firmware version is compatible with the touchscreen you're replacing. If the versions aren't compatible, you might encounter some anomalies. Also, don't forget to calibrate the new touchscreen post-installation for optimal performance. I found these steps to be helpful when I was troubleshooting.

I've had to replace a touchscreen on a Red Lion G3 series HMI a while back, and it was definitely a bit tricky! The key for me was ensuring that I had the right tools and adhesive for the job. I also found it helpful to take my time with the disassembly to avoid damaging any internal components. If you haven’t yet, I’d recommend checking out Red Lion’s support resources or forums; they can have some great insights specific to different models which saved me a lot of headaches!

I haven't personally replaced the touchscreen on a Red Lion G3, but I know several folks who have tackled similar projects. They typically mentioned that sourcing the right replacement part was crucial, as some models can have variations. A few also recommended checking out the company’s service documentation for any specific disassembly instructions, which can make a huge difference. If you’re up for it, watching a few DIY videos online can also give you a good idea of the process! Good luck!

I haven't personally replaced the touchscreen on a G3, but I've read that handling the cables carefully during the process is crucial to avoid damaging anything else. Some users have also mentioned that using a heat gun to slightly warm the adhesive can make removing the old screen much easier. If you're up for it, there are some detailed guides and videos online that walk through the whole replacement step-by-step—definitely worth checking out!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. How do I replace the touchscreen on a Red Lion G3 series HMI? - To replace the touchscreen on a Red Lion G3 series HMI, you will need to follow the manufacturer's recommended procedure, which typically involves disassembly of the unit and careful installation of the new touchscreen.

FAQ: 2. Where can I find a replacement touchscreen for a Red Lion G3 series HMI?

Answer: - Replacement touchscreens for Red Lion G3 series HMIs can often be purchased directly from the manufacturer or authorized distributors. It is important to ensure that the replacement touchscreen is compatible with your specific model.

FAQ: 3. Are there any common issues or challenges when replacing the touchscreen on a Red Lion G3 series HMI?

Answer: - Some common challenges when replacing the touchscreen on a Red Lion G3 series HMI may include proper calibration, alignment, and ensuring that all connections are securely reattached during reassembly. It is recommended to follow the manufacturer's instructions carefully.

FAQ: 4. Is there a recommended troubleshooting guide for touchscreen replacement on Red Lion G3 series HMIs?

Answer: - While specific troubleshooting guides may vary, it is advisable to consult the user manual or technical support resources provided by Red Lion for guidance on touchscreen replacement issues. Additionally, online forums or communities may offer valuable insights from users who have encountered similar problems.