How to Reset CompactLogix L30ER and Assign New IP Address Without USB Cable

Question:

Good evening! I am attempting to change the IP address of a compact Logix L30ER without a USB cable and without knowing its current IP address. I am interested in resetting the device and assigning a new IP address using BootP. Despite trying to reset it through the small hole located under the run/rem/prog switch, I have been unsuccessful. Can someone please advise on how I can successfully reset the device and assign a new IP address? Thank you for any help or information you can provide.

Top Replies

To easily configure an EthernetIP Driver in RSLinx, simply connect a device with an assigned IP address to the Ethernet port. If this is the only device being connected and is not part of a network, the driver will only populate with the IP address of the CompactLogix being worked on. This method is effective for identifying unknown IP addresses and ensuring smooth connectivity. Experience seamless setup and troubleshooting with this straightforward process.

Are you discussing the usage of an Ethernet/IP driver for a driver connection? Will this function correctly without knowledge of the network it is connected to? For instance, if my device's IP address is 192.168.1.240, but I am unaware of the specific numbers for the CompactLogix IP address.

Uncertain if your laptop needs to be within the same range, but it's worth a quick test. I'll try it on one of the laptops on my bench to see if it works. Only takes 2 minutes to find out!

As I am currently testing it, I have found that the IP driver only functions when the first three numbers match, indicating that devices need to be on the same network. My next task is to set up a PanelView Plus 1250, and I anticipate that once I have configured one device on the network, setting up the other will be a more straightforward process.

To my knowledge, the L30 should be equipped with a front USB port for easy connectivity and access to properties, including the configured IP address. Will this feature be available?

Hey there! You might want to try using the BootP utility from Rockwell. You'd need to physically connect your device to your network, then power it up. BootP should detect it on the network and it should show an MAC address but not an IP. From there, simply set the desired IP using BootP and hit the 'apply' button. Please remember to disable BootP afterward for that device to avoid future issues. Also, be aware that this could potentially affect communication with your PLC if your network is not set up in the proper way. Hope this helps!

Sure thing! Have you tried using the Rockwell BootP Utility? It’s a free software provided by Rockwell Automation that helps in assigning and resetting IP addresses of its devices. Once you install it, select the device (it should appear in the list as long as it's on the same network, even if the IP is unknown) and assign a new IP address. Click on the 'Set' button to apply the change. But please remember to disable BootP once done, as the controller will initialize in BootP mode each time you cycle power if left enabled.

Hey there! If you’re having trouble with the reset, make sure you're holding the reset button long enough—sometimes it takes a good 10-15 seconds for it to register. Once it’s reset, you should be able to use BootP to find the device on your network. Just ensure that your BootP server is set up correctly and listening for new devices. If you're still having issues, checking your firewall settings could help, too, as sometimes they block BootP packets. Good luck!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. How can I reset a CompactLogix L30ER without a USB cable and without knowing its current IP address? - To reset the device, you can use the small hole located under the run/rem/prog switch. If this method is not successful, you may need to refer to the device's manual or contact technical support for further assistance.

FAQ: 2. How can I assign a new IP address to a CompactLogix L30ER using BootP?

Answer: - To assign a new IP address using BootP, you can follow the instructions provided in the device's manual or seek guidance from technical resources familiar with the specific process for CompactLogix L30ER.

FAQ: 3. What steps should I take if I am unable to reset the CompactLogix L30ER through the small hole?

Answer: - If the reset through the small hole is unsuccessful, you may need to explore alternative methods recommended in the device's documentation or consult with technical experts for troubleshooting assistance.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →