How to Reset Counter on Delta HMI using DEL + 0 Function Keys

Question:

I am upgrading from an OP7 to a new Delta HMI. Currently, the customer is able to reset a counter by pressing DEL + 0 simultaneously. However, upon reviewing the original OP7 program and manual in ProTool, I cannot locate a specific setting for this key combination. As a result, I am unsure of its functionality (such as moving a value to a register). Any assistance on this matter would be greatly appreciated. Thank you, Brett.

Top Replies

It appears that user-programmable functions cannot be assigned to the DEL button, and the DEL + 0 combination is not a standard feature. It seems that only one screen and one input/output field are available. It is possible that the cursor is constantly on the counter, so by deleting the content with DEL and inputting zero with 0 before finalizing with ENTER, the counter can be reset.

It seems like that could be the solution...The operators mentioned that they need to press it at the same time. Your explanation seems more plausible.

Hey Brett, it sounds like you're dealing with a classic case of 'legacy quirks' often encountered during system upgrades. Speaking from experience, in some old systems, certain key sequences were hard coded into the applications rather than being configurable features. Your situation sounds similar. The DEL + 0 command you mentioned may not be explicitly spelled out in ProTool, because it was probably a custom code in the original OP7. In Delta HMI, you'd likely need to script this functionality yourself. Check in the event scripts or macro scripts section. Best of luck, and keep us updated on your progress!

Hey Brett, the DEL + 0 key combination might not be a predefined feature in ProTool, but rather a specific programming script that was initially input. I'd recommend reviewing the PLC logic to verify if the action was written into the ladder code. As you migrate to the Delta HMI, you'll want to recreate this functionality, and it's very likely that you’ll need to do so using the scripting capabilities of the new software. Good luck with the upgrade!

Hey Brett, it sounds like you're diving deep into the upgrade! It's possible that the DEL + 0 combination is a custom function that was programmed into the OP7, maybe through specific scripts or macros that aren't immediately visible in ProTool. For your Delta HMI, you might want to check if you can create a similar functionality within its logic or scripts. If the customer relies on this feature heavily, perhaps consider mapping the same reset action to a button on the new interface for continuity. Good luck with the transition!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. How can I reset a counter on a Delta HMI using the key combination DEL + 0? - Answer: The key combination DEL + 0 is used to reset a counter on a Delta HMI. It may not be explicitly documented in the original OP7 program or manual, but it is a common function on Delta HMIs.

FAQ: 2. I am transitioning from an OP7 to a Delta HMI. Will the DEL + 0 key combination still work for resetting counters?

Answer: - Answer: Yes, the DEL + 0 key combination for resetting counters should still work on the Delta HMI, as it is a standard functionality across Delta HMIs.

FAQ: 3. Where can I find more information about key combinations and functionality on Delta HMIs?

Answer: - Answer: You can refer to the user manual or documentation specific to the Delta HMI model you are using for detailed information on key combinations and functionality. Additionally, reaching out to Delta's customer support or online forums for assistance is recommended.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →