How to Resize Numeric Input Window in FactoryTalk SE

Question:

Hello there! Can anyone advise on how to resize the numeric input window in FactoryTalk SE? The current section for inputting numbers (as shown in the attached photo) is too small, and I am unsure how to increase its size. Any tips would be much appreciated.

Top Replies

Many individuals opt to create their own customized keypad, while others prefer utilizing the RSView32 ActiveX keypad for their specific needs.

Sure, I'd be happy to help. In FactoryTalk SE, unfortunately, the size of the numerical input pop-up window is predetermined by the program and doesn't offer a resize option. However, you might consider designing your own input pop-up window using standard graphics with a list box or text box, which allows raising the size. The trade-off is a bit more scripting work, but it might be worth it for improved UI!

Hi there! It looks like you're trying to adjust the numeric input object's size in FactoryTalk SE, which is quite straightforward. Just click on the numeric input window and drag the edges to your preferred size based on the workspace you have. However, bear in mind, the alignment and the contrast of that field with the surrounding elements might impact the overall UI design. So, going for optimal rather than maximized might be a better choice.

Hey there! You can adjust the numeric input size in FactoryTalk SE using Parameter file objects. Just open and edit your parameter file, then go to Display Settings. There, you'll find a height and width box for the numeric input. You can adjust these values to modify the field's size to meet your requirement. Just remember to save the changes before closing the file, and you should see the changes take effect!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. How can I resize the numeric input window in FactoryTalk SE?

Answer: - To resize the numeric input window in FactoryTalk SE, you can adjust the size of the input section by following these steps: [provide steps here].

FAQ: 2. What should I do if the numeric input window in FactoryTalk SE is too small for inputting numbers?

Answer: - If the current section for inputting numbers is too small, you can increase its size by [mention the specific method or settings to adjust the size].

FAQ: 3. Is it possible to customize the size of the numeric input window in FactoryTalk SE?

Answer: - Yes, you can customize the size of the numeric input window in FactoryTalk SE to better suit your needs. Simply follow the steps to resize the input section according to your preferences.

FAQ: 4. Are there any tips for efficiently resizing the numeric input window in FactoryTalk SE?

Answer: - For efficient resizing of the numeric input window in FactoryTalk SE, it is recommended to [provide specific tips or tricks to effectively adjust the size of the input window].

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →