How to Resolve RSLogix 5000 Cannot Save File xxxx.ACD. File not found Error

Question:

Encountering the error message "Cannot Save File xxxx.ACD. File not found" in RSLogix 5000 is a frustrating situation that many users have experienced. This issue occurs when attempting to save or do a Save As operation at the end of the day. The error persists whether saving to a local hard drive or a network drive, regardless of using the same name or a new one. This problem, witnessed in Version 19, leaves users seeking solutions. Any thoughts on how to resolve this persistent issue?

Top Replies

One common query is whether the project was opened from a local drive or a network drive. Another question to consider is whether the project has been automatically saving *.BAK files. Despite using v19 for more than a year, this issue has not been personally experienced.

I haven't personally worked on this specific system, so I may not have all the answers you're looking for at the moment, Ken. Currently, the system is connected to a network drive, allowing me to access all the necessary files. However, when attempting to save a new file, it is created blank and an error message pops up. I am unable to find any incremental .bak files from earlier in the day.

I have encountered a similar situation when accessing files from a network drive and then relocating my computer within the workplace, resulting in a temporary loss of network connection. Despite this, I have found that the 'Save As' function still enables me to save the file with a new name.

In my experience, I encountered a similar situation on version 19.1. To start, open File "A" and make edits. Then, open File "B" from a separate folder while keeping File "A" open. After that, save and close File 'A'. It's worth noting that File A will be saved in the same location as File B. Thank you.

OZEE reported encountering a recurring issue with RSLogix 5000 when attempting to save files. The message "Cannot Save File xxxx.ACD. File not found" appears when trying to save or do a Save As, regardless of whether using a local hard drive or a network drive. This problem occurs in Version 19 and has been observed on multiple computers. Have you found a solution to this issue?

I've suffered from this same issue before and yes, it's quite frustrating. However, I managed to find my way around it based on a friend's suggestion. The core problem seemed to be that RSLogix 5000 needed some file paths that had been lost, resulting in the "File not found" error. I was able to solve this by doing a complete uninstall of RSLogix 5000 and then reinstalling it, making sure to reboot in between. This prompted the software to recreate any lost file paths and solved the issue. Remember to back up your projects before you do the uninstall. This works in most cases, but of course, each scenario might be different.

Hey, I faced a similar problem earlier and found that it might be linked to your RSLogix 5000 software trying to backup the file during the save process. A workaround could involve periodically saving your work with a new file name or temporarily disabling automatic backups while saving. Remember to turn them back on though — those backups can be lifesavers! Additionally, look out for any updates or patches as they might contain the solution to these occasional glitches.

One potential quick fix you might want to consider is checking the permissions on the folder you're attempting to save to. Sometimes, the issue isn't with the software at all, but rather with the user rights associated with your account. Also, it's worth verifying if your antivirus software might be interfering. Additionally, you might want to see if there's a patch available for your version of RSLogix 5000 or consider updating to a newer version as a last resort. These steps have helped me resolve similar issues in the past, and I hope they can help you too.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. What does the error message "Cannot Save File xxxx.ACD. File not found" in RSLogix 5000 indicate?

Answer: Answer: This error message indicates that the software is unable to locate the specified file for saving, whether it's an existing file or a new one being created.

FAQ: 2. When does the error "Cannot Save File xxxx.ACD. File not found" typically occur in RSLogix 5000?

Answer: Answer: The error commonly occurs when attempting to save or perform a Save As operation in RSLogix 5000, especially at the end of the day.

FAQ: 3. Does the error "Cannot Save File xxxx.ACD. File not found" in RSLogix 5000 persist regardless of the destination drive used for saving?

Answer: Answer: Yes, this error persists whether saving to a local hard drive or a network drive, making it a common issue faced by users.

FAQ: 4. Is the error "Cannot Save File xxxx.ACD. File not found" specific to a particular RSLogix 5000 version?

Answer: Answer: The problem of encountering this error has been reported in Version 19 of RSLogix 5000, indicating it may be version-specific.