How to Safely Transfer Your Siemens TIA License Between PCs Using a USB Drive: A Step-by-Step Guide

Question:

Hello everyone, I need assistance with temporarily transferring my TIA license from one PC to another using a USB drive and then returning it afterward. Could you please provide a detailed, step-by-step guide on the correct procedure for doing this? I want to ensure that I do not risk losing my license during the process. When I right-click on the license, I see options for "transfer" and "generate code," but I am uncertain about the next steps. I’m a bit hesitant, so your guidance would be greatly appreciated! Thank you!

Top Replies

No need to stress! Transferring your license is simple. Just follow these easy steps: right-click on your license on your computer, then select 'Transfer' to move it to your USB drive. Once the transfer is complete, you’ll receive a confirmation message. To ensure everything went smoothly, I recommend checking your USB drive afterward to verify that your license file is safely stored there.

Thank you, JRW. How can I transfer files from a USB drive to another computer? Additionally, what are the options for generating codes? Is there a possibility for offline transfer as a method for transferring files? I’ve noticed this feature in the software.

Transferring files via USB is a straightforward process. If you don't have a USB flash drive available or your other computer is too far away, consider using an offline file transfer method for seamless data sharing.

Thank you so much for your help!

Always ensure you safely eject the USB drive before disconnecting it to prevent data loss and protect your files.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. What is the first step in transferring a TIA license using a USB drive?

Answer: - The first step is to insert the USB drive into the PC where the TIA license is currently active. Ensure that the USB drive has enough space to accommodate the license.

FAQ: 2. How do I initiate the transfer of the TIA license to a USB drive?

Answer: - Open the Siemens Automation License Manager on the PC with the active license. Right-click on the license you wish to transfer and select the "Transfer" option. Follow the prompts to move the license to the USB drive.

FAQ: 3. What should I do if I see options for "transfer" and "generate code" in the context menu?

Answer: - Choose the "Transfer" option to move your license to the USB drive. The "Generate Code" option is not needed for transferring licenses between PCs using a USB drive.

FAQ: 4. How do I activate the TIA license on the second PC using the USB drive?

Answer: - Insert the USB drive into the second PC, open the Siemens Automation License Manager, and locate the license on the USB drive. Right-click on the license and select the option to transfer it to the local PC.