How to Transfer Recipes and Record Data from PLC to Siemens WinCC TIA Portal HMI

Question:

Hello! A customer is interested in using a barcode reader to automate recipe selection on a TP1500 Comfort HMI. They already have recipe management set up on the HMI and are exploring options to select recipes and record data from the PLC as a primary or alternative method. Additionally, they need to transfer recipes from the HMI to the PLC. Is it possible to achieve this setup?

Top Replies

It's been a while since I've used it, but you have the option to utilize the Job mailbox in the PLC to submit requests on the HMI:SIOS system.

After researching the Job Mailbox, I came across job number 67, which involved transferring data from a Programmable Logic Controller (PLC) to a Human-Machine Interface (HMI). However, despite performing the task, the recipe did not update on the HMI as expected. When transferring a recipe to the PLC, the HMI's DataRecords in the designated Area Pointer should change accordingly. Additionally, the DataRecord should also update when executing the Job Mailbox operation. What could be the missing piece of this puzzle?

I researched the Job Mailbox and came across Job 69, which involves reading from a PLC and writing to an HMI. However, despite completing the task, the recipe did not update on the HMI. It seems that when downloading a recipe to the PLC, the DataRecords in the HMI Area pointer also change to reflect the new recipe. The DataRecord is also updated when the Job Mailbox is executed. Can you help me figure out what may be missing in this process?

Upon reflection, I do recall there being a peculiar aspect regarding the accuracy of the name. Upon reviewing a previous project in S7, I found that a function block was utilized to oversee the transfer process. Within the PLC, the recipe was specified as a UDT with two versions: a working version utilized by the machine and an upload/download version used by the recipe system. Initially, the monitoring FC identifies any failed transfers (status >0 >3S). Subsequently, if a transfer is ongoing (status =2), no further actions are taken. If a new download is not detected (status !=4), the working recipe copy is moved to the upload/download copy. In the case of a new download being detected: a) transfer the upload/download copy to the working copy, b) reset the status to 0. The HMI displays the recipe name from the working copy rather than the upload/download copy. I am unsure if the data record name undergoes any changes in the process.

While exploring the recipe view, I discovered that by selecting Properties/General, there are two tags that can alter the recipe and data record from the PLC. I appreciate your assistance, but I have found what I needed.

Absolutely, this is completely feasible. What the customer needs to do is incorporate an industrial barcode reader into their system that can communicate with both the HMI and PLC. Leveraging the PLC's capability to read from and write to memory tags, they can use the barcode reader to select specific recipes. For transferring recipes from HMI to PLC, they can use OPC servers or direct tag linkage, depending on their system requirements and design. However, the challenge here is to ensure robust programming and setup to facilitate seamless working of all these components together. It's a fascinating project!

Absolutely, it's possible to achieve this setup. A barcode reader can be effectively integrated to select recipes. The reading of the barcode can trigger a corresponding recipe call in the PLC, which then sends the necessary parameters to the HMI. Also, when it comes to transferring recipes from the HMI to the PLC, they can use Ethernet/Profinet communication as they are well supported on the TP1500 Comfort HMI and most PLCs. This setup not only brings in automation but also reduces the scope for human error and enhances data recording.

Absolutely, this setup is achievable. To select recipes through a barcode reader, you'll need to setup the barcode reader to communicate with the PLC. It's likely that your PLC and HMI already communicate with each other, so once you've established this barcode-PLC link, you should be able to use it to trigger different recipe operations from the PLC. As for transferring recipes from the HMI to the PLC, WinCC (TIA Portal) provides an easy way to export/import data blocks which can be used as recipes between the HPI and PLC. Remember to pay attention to your programming to avoid simultaneously executing conflicting commands. Also, ensure you're defining unique identification for each barcode to avoid recipe mix-ups.

Absolutely, this setup is achievable! You can use a barcode scanner connected to the TP1500 Comfort HMI for recipe selection. The scanner's input could trigger a specific recipe based on the scanned barcode, and this information could be relayed back to the PLC. For the transfer of recipes from the HMI to the PLC, you can utilize the built-in functionalities of Siemens TP1500 Comfort HMI. Specifically, try using the HMI recipe management functions, which should allow you to effectively transfer recipe data between the HMI and the PLC. Ensure to have proper coding implemented in your PLC program to handle the received data appropriately.

Absolutely, you can set up a barcode reader with the TP1500 Comfort HMI to automate recipe selection! Most HMI systems, including the TP1500, support external devices like barcode scanners through appropriate communication protocols. You can program the HMI to read the barcode and match it with the corresponding recipe in your management system. For transferring recipes from the HMI to the PLC, utilizing a database or a structured file format like XML could streamline that process. Just ensure that your PLC and HMI are compatible and that you’ve configured the right data exchange settings to make everything seamless. It's definitely a great way to enhance efficiency in your operations!

Hey there! Yes, it's definitely possible to integrate a barcode reader with the TP1500 Comfort HMI for recipe selection and data recording from the PLC. You can use the barcode reader to scan specific codes that correspond to your recipes, which would trigger the HMI to load the desired recipe. For transferring recipes from the HMI to the PLC, you might consider using OPC UA or another communication protocol supported by both systems to facilitate that exchange. Be sure to check the documentation for both the barcode reader and the HMI to ensure compatibility and leverage any available APIs for a smoother integration!

Absolutely, it's definitely possible to integrate a barcode reader with your TP1500 Comfort HMI for automated recipe selection. Most barcode scanners can easily interface with HMIs, allowing for quick recipe retrieval based on the scanned code. Additionally, you should be able to establish communication between your HMI and the PLC to facilitate both data recording and recipe transfers. Just ensure that your PLC and HMI support the necessary protocols for data exchange, like OPC UA or similar, which should streamline the entire process. It might also be a good idea to consult the documentation for your specific HMI and PLC models to confirm compatibility and setup steps. Good luck with your automation project!

Hi there! Yes, it’s definitely possible to set up your TP1500 Comfort HMI to automate recipe selection using a barcode reader. You can use the HMI’s communication capabilities to interface with the PLC for both selecting recipes and transferring data. Make sure your barcode reader is compatible and that you have the appropriate software or scripts to handle the recipe selection logic. Additionally, you can utilize functions in the HMI to communicate with the PLC for recipe transfers, keeping everything streamlined. Good luck with your project!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Can I use a barcode reader to automate recipe selection on a TP1500 Comfort HMI?

Answer: - Yes, it is possible to use a barcode reader to automate recipe selection on a TP1500 Comfort HMI. This can streamline the process and improve efficiency in selecting recipes.

FAQ: 2. How can I transfer recipes from the HMI to the PLC in Siemens WinCC TIA Portal?

Answer: - To transfer recipes from the HMI to the PLC in Siemens WinCC TIA Portal, you can utilize communication protocols such as Profinet or Profibus to exchange data between the devices.

FAQ: 3. Is it possible to record data from the PLC to the HMI for recipe management purposes?

Answer: - Yes, it is possible to record data from the PLC to the HMI for recipe management purposes. By setting up appropriate communication and data logging functions, you can capture and store relevant data for analysis and tracking.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →