How to Troubleshoot Connecting to C-H D32LT PLC with WINDRIVER Error using USB to Serial Converter Cable

Question:

I need assistance with connecting to a D32LT PLC as I keep encountering an error with the WINDRIVER. I am currently utilizing a USB to serial converter cable.

Top Replies

If you're working with an old PLC, it's essential to have a computer equipped with a genuine serial port. The USB to serial converter may not be compatible with many PLCs, so it's best to use a dedicated USB to serial cable specifically designed for this purpose. For optimal performance, it's advisable to use a computer running Windows XP.

I have tested Windows XP and I am wondering if there is a specific driver that I may have overlooked.

I am unsure of the answer, my apologies. I have personally used the Keyspan 19HS adapter, which can be found at the link below, for Rockwell (AB) plcs with some success. It may be worth trying out. It is possible that the driver you require is unique and included in the installation software package. You can find the adapter here: http://www.tripplite.com/high-speed-usb-to-serial-adapter-keyspan~USA19HS/. Another useful link to consider is http://www.foxautomation.com/wingpc/. Additionally, it appears that the program installation files resemble those of Windows 98. You may need to use a computer with Windows 98 installed.

Thank you for the information. I am having trouble locating the driver within the software package I downloaded from the website you recommended, http://www.foxautomation.com/wingpc/.

@Levi G, I'm interested to know what method you ended up using for communication. Did you rely on an old computer and outdated Windows software?

It sounds like your issue may lie in the communication drivers for your USB to serial converter cable. Try reinstalling them to ensure they're up-to-date. Also, check the WINDRIVER settings to ensure that the communication parameters match those of the D32LT PLC. If you've already done these steps, perhaps there's a problem with the cable itself or the PLC may need to be reset or updated. Troubleshooting can be a process of elimination, so let us know what steps you've already taken and we can help you work through what's left.

It sounds like you might be facing a driver compatibility issue. Ensure that your USB to serial converter cable has an up-to-date driver installed. If another computer is available, try to connect your PLC to it and see if it yields the same error. Sometimes, WINDRIVER issues can be mentioned by the PLC but the actual problem could be somewhere else in the chain, so double-check all connections and hardware. Finally, remember to have your D32LT PLC's configuration correctly setup in your PLC programming software.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. Q: What could be causing the error when trying to connect to a D32LT PLC using a USB to serial converter cable and WINDRIVER? The error could be due to various factors such as driver issues, incorrect settings, or compatibility problems.

FAQ: 2. How can I troubleshoot the connection issue with the D32LT PLC and WINDRIVER using a USB to serial converter cable?

Answer: You can troubleshoot by checking the driver installation, ensuring correct settings on both the software and PLC, and verifying the compatibility of the USB to serial converter cable.

FAQ: 3. Are there specific steps or guidelines to follow when troubleshooting the connection problem with the D32LT PLC and WINDRIVER?

Answer: Yes, you can start by checking the device manager for driver issues, confirming the COM port settings, and testing the cable with other devices to rule out hardware problems.

FAQ: 4. Where can I find resources or support for resolving connectivity issues with the D32LT PLC and WINDRIVER?

Answer: You can refer to the manufacturer's documentation, online forums, or contact technical support for assistance in troubleshooting and resolving the connection problem.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →