How to Upload Project with AC31GRAF programming software from 907 PC 331 PLC 07KR31

Question:

Hello! I need assistance with using AC31GRAF programming software to upload a project developed by 907 PC 331 from PLC 07KR31. Please excuse any language errors, as English is not my native tongue. Can someone provide guidance on this process?

Top Replies

The ABB models that utilized 907 PC 331, such as the 07K31, were primarily programmed in a DOS-based environment. My experience with these devices on an Italian press was less than ideal. Unfortunately, ABB no longer provides information on their older Advant products, including the AC31 PLC. If you require the 907 PC 331 software, I could potentially assist you, although it may not be helpful for modifying a program on a 07K31 PLC. The software is cumbersome and not user-friendly, requiring the original code for access. Considering the level of ABB support in your region, particularly in Europe or the Middle East, it may be worth exploring options for assistance. While ABB's AC drives are well-supported, there may be limitations with PLC support. If support is unavailable, it may be necessary to replace the ABB PLC and start fresh. This decision, although tough, will ensure that you have a supported PLC in the long term. I possess the 907 PC 331 software if you have a DOS-based PC and are interested in trying it out. Additionally, ABB produced multiple PLCs under the Advant name, including the AC31 or CS31 models. It is possible that the AC31GRAF was intended for newer controllers than the 07K31, but further clarification may be needed.

In 2003, loolrsdoran stated that ABB models such as the 07K31, which utilized the 907 PC 331, were exclusively dos-based devices. These devices were not user-friendly and were difficult to work with. The ABB website no longer provides information on older Advant items, including the AC31. If you need the 907 PC 331 software, I may be able to assist you, but it may not be useful for downloading programs from a 07K31 PLC for modification. The software is cumbersome and not conducive to online editing. If you do not have the original file for the PLC, this software will not be helpful. It requires the original code to access the PLC, and it does not support online editing. Depending on the quality of ABB support in your region, particularly in Europe and the Middle East, it may be beneficial to seek assistance there. It is important to determine if PLC support is available in your area. If support is unavailable, it may be necessary to consider investing in a different PLC system that is fully supported. ABB also produced several PLCs under the Advent name, including the AC31 or CS31 models. The AC31GRAF may have been intended for newer model controllers rather than the 07K31. If you are searching for a 907 PC 331 download, feel free to reach out for assistance.

Hello rsdoran, I was wondering if you could provide me with the download link for the 907 PC 331 software. I am currently experiencing issues with my CS31 PLC and am in need of the software to resolve them. Any assistance you can provide would be greatly appreciated. Thank you.

Hello everyone, I am in need of the programming software for my CS31. Any help would be greatly appreciated. Thank you.

In response to a query about ABB PLC software, rsdoran explained that the models utilizing 907 PC 331, such as the 07K31, were programmed in DOS. Having dealt with these on an Italian press, rsdoran expressed a strong dislike for them. The ABB website no longer provides information on older Advant items, including the AC31. Despite possessing the 907 PC 331 software, rsdoran warned that it would not facilitate downloading or modifying programs on a 07K31 PLC. Furthermore, rsdoran emphasized the software's clumsiness and difficulty. For those without the original PLC file, access is restricted without the original code, as it is DOS-based and lacks online editing capabilities. In terms of support, rsdoran recommended considering the superior ABB support in the Euro/Middle East regions compared to the US. While AC drives are well-supported, there may be issues with PLC support. If support is lacking, rsdoran advised abandoning the ABB PLC and starting fresh to ensure a supported system and improve familiarity with the software and equipment. Additionally, rsdoran offered the 907 PC 331 software for those with a DOS-based PC interested in trying it. It was noted that ABB produced multiple PLCs under the Advant name, with designations such as AC31 or CS31. Though uncertain about the AC31GRAF, rsdoran speculated that it may have been intended for newer model controllers than the 07K31.

Hello! No worries about your English; your question is pretty clear. I think the easiest way for you to proceed is to first save the project developed by 907 PC 331 into a .txt or .csv file. Then, open the AC31GRAF software and use the import function to upload your saved file. Make sure your PLC is connected to your computer during this process. Troubleshooting may arise, but generally, this method should work!

Certainly, I'd be happy to help with that! Firstly, make sure you have the correct drivers installed for RS232/485 cable. Then, open up your AC31GRAF software, select File -> Project upload. Select the correct COM port that the PLC is connected to and follow the prompts. It may ask to overwrite the existing project; make sure you have a saved backup. You also need to ensure the PLC you are working with, 07KR31, is compatible with the programming software. If you face any issues, there might be hardware constraints, baud rate mismatch, or COM port selection errors. Feel free to share more details if you've encountered specific issues!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. How can I upload a project developed by 907 PC 331 from PLC 07KR31 using AC31GRAF programming software? - To upload a project from PLC 07KR31 using AC31GRAF programming software, you can follow these steps: [provide steps or guidance here].

FAQ: 2. Are there any specific settings or configurations required to upload a project with AC31GRAF programming software?

Answer: - Yes, there might be specific settings or configurations needed to successfully upload a project. You may need to ensure that the communication settings between the software and the PLC are correctly configured.

FAQ: 3. What are some common issues that users face when uploading projects with AC31GRAF programming software?

Answer: - Some common issues users face when uploading projects include communication errors, incorrect settings, outdated software versions, or hardware compatibility issues.

FAQ: 4. Is there a user manual or documentation available for AC31GRAF programming software that can help with the upload process?

Answer: - Yes, you can refer to the user manual or documentation provided with the AC31GRAF programming software for detailed instructions on how to upload projects from PLC 07KR31.

FAQ: 5. How can I troubleshoot any errors encountered during the project upload process with AC31GRAF programming software?

Answer: - If you encounter errors during the upload process, you can try troubleshooting steps such as checking the communication settings, ensuring proper connections, verifying software versions, and seeking assistance from technical support if needed.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →