How to Use On-Delay Timers as Universal Timers in Ladder Logic Programming

Question:

Are you looking for guidance on how to create a pulse timer or a pext timer using a delay-on timer in ladder logic programming? The delay-on timer is often referred to as a universal timer because it can be utilized to design various types of timers in automation systems. Understanding how to leverage this versatile timer can significantly enhance your project.

Top Replies

Choosing the Right Programmable Logic Controller (PLC) for Your Needs

S7-1215: Enhanced Automation Controller for Efficient Industrial Solutions

User aftab_khan inquired about creating a pulse or pext timer using an on-delay timer within ladder logic programming. The on-delay timer is often referred to as a universal timer, as it can be utilized to construct various other timer functions. To achieve this, you can implement two TON (Timer On Delay) timers across two separate rungs, depending on the desired pulse duration and the timer's response speed (which can be set for intervals such as 1 millisecond, 1 tenth of a second, or 1 second). In the first rung, configure the first timer (T1) to manage the "On" duration. In the next rung, set up the second timer (T2) to control the "Off" duration. Once T2 completes its timing, the closed "Done" bit associated with T2 will reset both timers. Make sure to place the closed “Done” bit of T2 in the first rung. This bit will synchronize with the open "Done" bit from T1 to initiate the second timer (T2). For the final output of the On/Off pulse, create a third rung that uses contacts in series: an open contact from T1 and a closed contact from T2. This configuration will effectively manage your physical output based on the timing conditions you've set. By following these steps, you can successfully create a pulse timer using the versatile on-delay timer in ladder logic.

Create a function block that incorporates an IEC on-delay timer. Start by one-shotting your input signal. Utilize the inverted version of that pulse to control the timer. The output will be the negation of the pulse and the timer's completion status.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: Q1: What is an on-delay timer in ladder logic programming?

Answer: A1: An on-delay timer is a type of timer used in ladder logic programming that starts counting time when its input condition is met (i.e., the input rung becomes true). After a specified delay period, the timer's output becomes active. It is commonly used to introduce time-based control in automation systems.

FAQ: Q2: Why is the on-delay timer considered a universal timer?

Answer: A2: The on-delay timer is considered a universal timer because it can be configured to create various types of timing functions, such as pulse timers, pext timers, and others, by modifying its input conditions and output logic. This versatility makes it a valuable tool in designing complex automation processes.

FAQ: Q3: How can I create a pulse timer using an on-delay timer?

Answer: A3: To create a pulse timer using an on-delay timer, you can set the on-delay timer to turn on for a specific duration when its input condition is met. By configuring the timer to reset immediately after its output is activated, you can generate a pulse of a defined length.

FAQ: Q4: What is a pext timer, and how can it be implemented using an on-delay timer?

Answer: A4: A pext timer is a type of timer that provides an extended pulse output after its