Ideal Relative Humidity Levels for Storing Electric Motors in a 5000 sq ft Facility

Question:

Determining the ideal relative humidity levels for storing electric motors in a 5000 sq ft facility, ranging from 50hp to 3500hp for long-term storage.

Top Replies

If you plan on using space heaters and lubricating the bearings regularly, humidity control becomes less of a concern. Is it part of your setup?

During the Winter, our facility is equipped with heaters and will soon have air conditioning installed, especially important in the deep South where humidity levels can be high. In addition to storing oil and grease, we also house various rotating equipment like gearboxes, large hydraulic gear pumps, and rotary feeders. Our monthly equipment rotation program ensures optimal performance. To prevent condensation, we fill gearboxes with oil to eliminate any air space. Given these practices, it is crucial to monitor relative humidity levels closely.

Are motor space heaters necessary for storage? Consider either having space heaters running, storing motors with dessicant, or using a Class A controlled climate storage environment as specified in ANSI N45.2.6. This nuclear standard outlines restrictions on humidity and temperature for storage. My advice is based on my understanding of EPRI 1009698 - "Shipping and Storage of Electric Motors." For more detailed guidance, refer to EASA's "Large Electric Motor Handbook." Unfortunately, I don't have my copy on hand.

When storing electric motors, particularly in that hp range, it's critical to maintain humidity levels around 30% to 50%. Excess moisture can lead to corrosion and insulation damage, while too low humidity can cause static buildup. Additionally, it's beneficial to monitor temperature levels and maybe even use dehumidifiers or climate control systems to ensure a stable environment, as this can prolong the lifespan of the motors significantly. A consistent environment will ultimately save on maintenance and replacement costs down the line!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. What are the recommended relative humidity levels for storing electric motors in a 5000 sq ft facility?

Answer: - It is generally recommended to maintain a relative humidity level between 40% to 60% for storing electric motors in a facility.

FAQ: 2. Why is it important to control relative humidity levels for storing electric motors?

Answer: - Controlling relative humidity levels helps prevent moisture-related issues such as corrosion and insulation degradation in electric motors, ensuring their longevity and performance.

FAQ: 3. How can I measure and regulate relative humidity levels in a 5000 sq ft facility?

Answer: - You can use a hygrometer to measure relative humidity levels and implement dehumidifiers or humidifiers to regulate the humidity within the recommended range.

FAQ: 4. Are there specific considerations for storing electric motors of different power ranges, such as 50hp to 3500hp?

Answer: - While the recommended relative humidity levels generally apply to all electric motors, larger motors may require additional protection measures and monitoring due to their size and power capacity.

FAQ: 5. What other factors besides relative humidity should be considered for optimal storage of electric motors?

Answer: - In addition to relative humidity, factors such as temperature control, cleanliness, and proper ventilation play a crucial role in maintaining the quality and performance of electric motors during storage.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →