IDEC PFA-1A51 Cable Pinout Diagram for FA-2Junior PLC Programming

Question:

Can anyone provide a pinout diagram for an IDEC PFA-1A51 cable or suggest where I can find one? This cable is essential for programming the FA-2Junior PLC.

Top Replies

Is this the cable connecting the link adapter to the PLC? If so, I have a cable that I can trace the pinouts for you. Please inform me if you need assistance with this.

Yes, it is indeed, and I express my gratitude to you.

The PFA-1A51 cable features a pin for pin connection on the wide side of the connector and the outer two pins on the short side, while the center two pins are swapped on the short side. The connectors are labeled with part number P8 J008, which may be interchangeable with Fujitsu's FCN-363J008. The prefix for the part number could range from 361 to 364. For more information, refer to the datasheet at this link: http://www.mouser.com/catalog/specsheets/fcn-360series.pdf. If you require assistance in constructing the link adapter, feel free to reach out. Explore this thread for a similar interface or link adapter: http://www.plctalk.net/qanda/showthread.php?t=69165&highlight=ex100.

I was looking for the PFA-1A51 pinout and I appreciate you providing the exact information I needed.

Looking for a windldr for FA-2J PLC? Please contact me at [email protected]

Hey there! I'm familiar with the FA-2Junior PLC but don't have the specific pinout diagram for its IDEC PFA-1A51 cable offhand. However, have you tried reaching out to IDEC's tech support team or scoured through their website? They should undoubtedly have this specific info. If not, you might want to pose the question on some dedicated electronics forums like Electronics Stack Exchange or All About Circuits. Their community is super knowledgeable and more likely to have someone who has worked with that specific cable.

I understand your dilemma. IDEC's official site should definitely be your first point-of-call as they are obligated to provide technical documentation for their products. If you have trouble navigating the site or can't find what you’re looking for, you might also want to take a look at some PLC-oriented forums like PLCTalk or the Reddit PLC subreddit. Communities in those forums are always helpful and someone might have already asked for the same pinout diagram there. And don't forget, sometimes a quick call or an email to IDEC's support desk can save you a lot of time.

Unfortunately, I don't have a pinout diagram for the IDEC PFA-1A51 cable off-hand, but you might try reaching out directly to IDEC's customer support. They've been pretty helpful in my experience. Alternatively, you can also check out some reputable electronics forums, like EEVBlog or All About Circuits. Sometimes, other users may have run into the same problem and found a solution.

I don’t have the pinout diagram handy, but I found some helpful resources on IDEC's official website and user forums where enthusiasts share schematics. You might also check out sites like GitHub or PLC programming communities; sometimes, members upload their own diagrams there. Good luck, and I hope you get your PLC programmed smoothly!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Where can I find a pinout diagram for the IDEC PFA-1A51 cable used in FA-2Junior PLC programming?

Answer: Answer: You can find the pinout diagram for the IDEC PFA-1A51 cable either by requesting it from IDEC directly or by searching for technical documentation on their official website or forums.

FAQ: 2. Is the IDEC PFA-1A51 cable specifically designed for programming the FA-2Junior PLC?

Answer: Answer: Yes, the IDEC PFA-1A51 cable is essential for programming the FA-2Junior PLC, and it plays a crucial role in establishing communication between the PLC and the programming device.

FAQ: 3. Are there any alternative sources or compatible cables that can be used for programming the FA-2Junior PLC if the IDEC PFA-1A51 cable is not available?

Answer: Answer: While the IDEC PFA-1A51 cable is recommended for programming the FA-2Junior PLC, you may explore compatible cables from other manufacturers or check if IDEC offers any updated versions that can serve the same purpose.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →