Integrating FactoryTalk View SE with ControlLogix: Design and Runtime Tag Access Solutions

Question:

I am currently integrating a FactoryTalk View SE Application with an existing ControlLogix system. Due to my remote access limitations, I can only connect to the PLC via a CLX Gateway, using an Ethernet Bridge and DHRIO card. During runtime, the application will communicate directly with the Ethernet network within the ControlLogix chassis. To leverage the capabilities of Event and Alarm features, I incorporated RSLinx Enterprise; however, I encountered challenges accessing the tags. To resolve this, I installed an additional OPC Server (RSLinx) with a matching topic or shortcut name to view the tags and test the display configurations. I've observed that when selecting tags from the online tag browser, a prefix appears before each tag, such as {:RSLinxEnterprise:[shortcut]tag} or {:RSLinx:[shortcut]tag}. My goal is to utilize RSLinx during the design phase and switch to RSLinx Enterprise during runtime. I've successfully accomplished this in the past, but I am currently facing difficulties. Any assistance would be greatly appreciated.

Top Replies

Why choose this setup? Simply configure your PC FT Directory to connect with the SE Server, and you can effortlessly design on your local machine while having direct visibility of all the PLCs that the server accesses. This seamless integration enhances your workflow and ensures real-time updates.

It sounds like you're on the right track but hitting some common hurdles with tag management in FactoryTalk. One thing that might help is ensuring that the shortcut names in RSLinx match exactly with what you've configured in RSLinx Enterprise, as any discrepancy can cause issues with tag resolution. You could also consider creating a single unified tag database that you can reference in both environments to reduce the complexity during the switch. Additionally, check your security settings and permissions on both OPC servers to ensure that there aren’t any access issues. Lastly, have you looked into using RSLinx as a “bridge” for tags, so you can seamlessly swap to Enterprise later? It can really streamline your process if set up correctly!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →