Integrating FactoryTalk View SE with Redlion DSPGT Controller

Question:

Is it possible to integrate FactoryTalk View SE with a Redlion DSPGT Controller?

Top Replies

In short, the answer is no. However, you can configure the DSPGT using the free software package called "Crimson" by Red Lion. It's important to note that the DSPGT is not a controller; it primarily functions as a data converter. The software also includes a built-in web server and virtual HMI, allowing you to perform basic SCADA operations. Additionally, Rockwell's FT View is a comparable product that can be run on a PC. Therefore, the need to utilize one to "program" the other is uncertain.

Are you utilizing the DSP as a gateway for other PLCs? If so, you can indeed communicate through it. However, it primarily functions as a protocol converter.

An essential Ethernet driver for Allen Bradley devices on the DSPGT platform within Crimson 3 is the DF1 Slave. This configuration allows the DSPGT to be recognized in RSLinx as an SLC 5/05, enabling the seamless transfer of register data to FactoryTalk using gateway blocks or similar tools. Experience enhanced connectivity and data management with this feature.

How incredibly pleasant it is. Such a delightful experience.

In Crimson 3, one of the Ethernet drivers for Allen Bradley on the DSPGT is the DF1 Slave, which allows the DSPGT to be recognized in RSLinx as a SLC 5/05. By utilizing gateway blocks, users can transfer register data to Factory Talk. Currently, I am working on setting up this process with a DA10D device to interface with Factory Talk. Despite selecting the driver, I am unable to get the device to appear as a SLC 5/05 in RSLinx. The DA10D is only displaying as a yellow question mark under ethernet I/P devices. Any suggestions or guidance on this issue would be greatly appreciated.

Absolutely, you can integrate FactoryTalk View SE with a Redlion DSPGT controller. You'd need to use something like Kepware or RSLinx as a communication driver between the two. It's a bit more complex to set up initially, but once you have it up and running, you should have good, reliable communication. Just be prepared for a bit of a learning curve if you're not familiar with these systems.

While I haven't executed this specific integration myself, it certainly seems plausible. FactoryTalk View SE is quite versatile and works with many different protocols and devices. Meanwhile, RedLion controllers, including the DSPGT, are known for their broad communication capabilities. You would likely need to use some form of OPC to interface between the two. However, the specifics might depend on the version and setup of your systems. It would be beneficial to consult with a technical support team or look for case studies where others have attempted similar integrations.

Absolutely, you can integrate FactoryTalk View SE with a Redlion DSPGT Controller. The best way to achieve this would be using OPC (OLE for Process Control). Redlion has an OPC server already equipped in it, and FactoryTalk has the capability of being an OPC client, which allows you to communicate data seamlessly between the RedLion controller and FactoryTalk. Essentially, this integration turns into a conversation, where FactoryTalk 'asks' Redlion for data, and Redlion 'responds' with the requested information. Do remember to get your OPC parameters and configuration set up correctly to ensure a successful integration.

Absolutely, it's possible to integrate FactoryTalk View SE with a Red Lion DSPGT controller, although it may require some configuration. The key is to leverage the communication protocols supported by both systems—typically, you can use Ethernet/IP or Modbus TCP for seamless data exchange. Just be sure to set up the proper tags in FactoryTalk to map to your DSPGT's data points, and don't forget to consider any necessary driver installation. With a little patience during the setup, you should be able to achieve smooth integration!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. Can FactoryTalk View SE be integrated with a Redlion DSPGT Controller? - Yes, it is possible to integrate FactoryTalk View SE with a Redlion DSPGT Controller.

FAQ: 2. What are the benefits of integrating FactoryTalk View SE with a Redlion DSPGT Controller?

Answer: - Integrating FactoryTalk View SE with a Redlion DSPGT Controller allows for enhanced monitoring, control, and visualization of the controller's data within the FactoryTalk View SE environment.

FAQ: 3. What steps are involved in integrating FactoryTalk View SE with a Redlion DSPGT Controller?

Answer: - The integration process typically involves setting up communication protocols and configurations between FactoryTalk View SE and the Redlion DSPGT Controller. Specific steps may vary depending on the software versions and network setup.

FAQ: 4. Are there any compatibility issues to consider when integrating FactoryTalk View SE with a Redlion DSPGT Controller?

Answer: - It is essential to ensure compatibility between the software versions of FactoryTalk View SE and the Redlion DSPGT Controller to ensure a successful integration process. Checking compatibility requirements and documentation is recommended.

FAQ: 5. Can real-time data from the Redlion DSPGT Controller be displayed and monitored in FactoryTalk View SE?

Answer: - Yes, by integrating FactoryTalk View SE with a Redlion DSPGT Controller, users can display real-time data, monitor processes, and interact with the controller's data through the FactoryTalk View SE interface.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →