Integrating Lenze VFD Control with Opto 22 SNAP PAC: Programming Speed Adjustments via Analog Input

Question:

I'm interested in integrating a Lenze Variable Frequency Drive (VFD) with the Opto 22 SNAP PAC system. At the moment, I'm using a potentiometer to adjust the speed of the VFD. Is it possible to program the SNAP PAC to modify the VFD speed based on an analog input value? I'm considering the SNAP-PAC-R1/2 and SNAP-AOV-25 modules for this application. Am I heading in the right direction?

Top Replies

The Lenze drive is versatile and adaptable, allowing you to use either a 4-20mA signal or a 0-10V input. Simply configure your chosen option as the set point source, and you're ready to go! This flexibility makes the Lenze drive an ideal solution for various applications.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →