Integrating Micro850 PLC with SureStep Stepper Drive: Voltage Output Challenge Solution

Question:

Hello everyone! I am currently working on integrating a Micro850 PLC to control a SureStep Stepper drive (DM805-AI) from Automationdirect. I am facing a challenge with the voltage output from the Micro850, as it is 24VDC while the Pulse input to the drive requires sourcing (0V to pulse high). I have come across several solid-state relays capable of cycling at 100kHz, but the only PNP to NPN converter I found from Phoenix is limited to 15kHz. Have any of you encountered a similar issue and if so, what solution did you implement? Your insights are greatly appreciated!

Top Replies

The Continental I.O.-ODC-R0-060 Interface Module: Features and Functions

Apologies for the premature post. Before proceeding, be sure to research the part number to confirm its compatibility. I have utilized numerous times in the past with no complications.

Thank you for the recommendation. Upon further reflection, I recalled using these components 15 years ago in a previous position. Regrettably, they have since been discontinued. Even after reaching out to Power IO, the manufacturer of the original part, I discovered that they too have stopped producing them. The substitute available now is bulkier and only has a frequency rating of up to 20kHz.

After a moment of reflection, I came to the realization that I would be open to exploring other opportunities if they exist.

Looking for spare parts in Chicago? I may have some available to share, but I need to know what you'll do in exchange.

Hey there! I too faced a similar challenge once. I suggest you use optocouplers as a simple and effective solution. They should isolate and convert between voltage levels. With an appropriate circuit design, you'll be able to adapt the PNP outputs for NPN inputs. They're also capable of managing the speed you need. Just ensure to use one which can handle high frequency. I've had success with PC817 optocouplers but choose according to your specific requirement. Good luck and let us know how it pans out!

Hey there! I've encountered a similar problem in the past, but I managed to get around it by using an opto-isolator. Opto-isolators provide galvanic isolation and are great in circuit level shifting applications like yours. Just remember to handle the power dissipation issue properly. Besides, using a pull-up resistor at the output to ensure correct signal levels is a good practice. You may need to test different resistor values to optimize the signal quality as per your requirement. Hopefully, this will help you out with the Micro850 to SureStep issue.

Hello! It sounds like you have quite the challenge on your hands. From your description, it seems like you might be able to utilize an optocoupler instead of the PNP to NPN converter. In this context, the optocoupler could serve the dual purpose of a relay and a level shifter. Many optocouplers can easily handle the frequency you're working with and the voltage levels from the Micro850. You can then use an additional resistor to match the voltage to the SureStep's requirements, as the high frequency won't affect the performance. Remember to take into account the forward current of the optocoupler when sizing the resistor. Hope this helps, and best of luck with your project!

Hey there! I've grappled with a similar issue in one of my past projects. You're on the right track with solid-state relays, but even at 100kHz, you might face potential flickering issues. I'd recommend looking into a digital isolator, specifically those with high-frequency capabilities. These are excellent for voltage level shifting and can easily handle the 0V to 24V transition your setup requires. Analog Devices is a manufacturer I've had success with in the past. Their application team is really good and their resources might help you decipher the best isolator for your setup. Also, remember to consider the total power requirement before choosing an isolator. Hope this helps!

I ran into a similar issue when working with different PLCs and drives. One solution that worked well for me was using isolating opto-couplers instead of relays. They can handle the frequency requirements better and provide a solid separation between the PLC and the stepper drive. Make sure to choose ones that are rated for the high-speed operation you need—some can easily handle the 100kHz pulse while maintaining the voltage levels. It might be worth looking into those as an alternative! Good luck!

Hey there! I faced a similar challenge when integrating different systems, and I found success using an opto-isolator instead of a solid-state relay for converting the signals. This allowed me to maintain the necessary speed while achieving the voltage level shift. You can look for a high-speed opto-isolator that suits your frequency needs; some are capable of handling much faster pulse rates than 15kHz. Just make sure it can handle the power requirements of your stepper drive. Good luck, and I hope this helps!

Hey there! It sounds like you're dealing with a bit of a tough situation, but I may have a couple of solutions you could explore. One option might be to look into using a high-speed optoisolator or a dedicated pulse converter that supports higher frequencies—some of these can handle much faster switching rates. Another route is considering a different type of interface, like a relay module specifically designed for stepper control that can convert the voltage levels you need while ensuring the signal stays fast enough for your application. Good luck, and I hope you find the right solution!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. What is the voltage output challenge faced when integrating a Micro850 PLC with a SureStep Stepper drive?

Answer: The voltage output from the Micro850 PLC is 24VDC, while the Pulse input to the SureStep Stepper drive requires sourcing (0V to pulse high).

FAQ: 2. What specific issue arises due to the voltage difference between the Micro850 PLC output and the Pulse input requirement of the SureStep Stepper drive?

Answer: The Pulse input of the SureStep Stepper drive requires sourcing (0V to pulse high) while the Micro850 PLC output is 24VDC, creating a compatibility challenge.

FAQ: 3. What solutions have been explored to address the voltage output challenge between the Micro850 PLC and the SureStep Stepper drive?

Answer: Solid-state relays capable of cycling at 100kHz were considered, but the only PNP to NPN converter found from Phoenix is limited to 15kHz.

FAQ: 4. Have other professionals encountered a similar issue when integrating a Micro850 PLC with a SureStep Stepper drive and how did they resolve it?

Answer: Professionals have shared their experiences and solutions for addressing the voltage output challenge between the Micro850 PLC and the SureStep Stepper drive in this discussion thread.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →