Is it safe to download CompactLogix L1 series C firmware version 32.015 from ControlFlash Plus or should I upgrade to Studio 5000?

Question:

Greetings, I recently acquired a PLC 1769-L18ER-BB1B series C with a minimum firmware requirement of 34. However, when searching through ControlFlash Plus for available firmware revisions, I came across version 32.015 for the C series. My Studio 5000 is currently at version 32. Can I proceed to download firmware version 32.015 for the C series in ControlFlash Plus and install it on the PLC? Alternatively, should I consider purchasing the latest Studio 5000 versions? Thank you, David.

Top Replies

A while ago, I conducted a test where I downgraded to firmware version v30. Happy Humpday (Wednesday)! I have a quick query about updating firmware on a controller. While organizing spare parts, I came across a new CompactLogix 17669-L16ER with a yellow sticker stating it needs firmware version 34. Can you provide guidance on upgrading firmware for this series C controller? Visit www.plctalk.net for more information.

Thank you, that is exactly what I was looking for.

Hi David, although you can technically proceed with the firmware version 32.015 for the C series, you may encounter some compatibility issues since the PLC you have acquired has a minimum firmware requirement of version 34. These reduced compatibility cases may impact the optimal running of your PLC. Yes, it might seem a bit costly at first, but considering future requirements and performance stability, updating your Studio 5000 to the latest version would be a good investment for the smooth running of your PLC. It ensures improved security, support, and access to new features which could aid your work.

Hi David, while it might be tempting to use the version 32.015 firmware you found for the C series with your current Studio 5000 at version 32, I wouldn't recommend it since the PLC you have explicitly needs a minimum firmware requirement of 34. Skirting around this requirement could lead to unstable system performance or in worse cases, possible system failure. Hence, it would be more prudent to invest in the newer versions of Studio 5000 that would meet your PLC's firmware requirement. Although a bit costlier, it ensures optimal performance and stability for your PLC.

Hey David! It sounds like you’ve got a solid grasp on your PLC setup. Since your firmware's minimum requirement is version 34, it's best to avoid version 32.015, as it falls short of what's needed for your 1769-L18ER-BB1B. I’d recommend upgrading your Studio 5000 to at least the version that supports firmware 34 to ensure compatibility and access to all the features. It might be a little investment in time and money, but you’ll have a smoother experience in the long run. Good luck!

Hey David! Since your PLC has a minimum firmware requirement of version 34, I would recommend against installing firmware version 32.015 because it won't meet that requirement and could lead to compatibility issues. It might be a good idea to invest in upgrading to the latest version of Studio 5000, which should give you access to the proper firmware updates for your PLC model. This way, you'll ensure you're working with the most stable and secure firmware, plus you’ll be prepared for any future updates. Good luck!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Can I download and install CompactLogix L1 series C firmware version 32.015 from ControlFlash Plus if my PLC has a minimum requirement of 34?

Answer: - No, if your PLC model requires a minimum firmware version of 34, it is not advisable to download and install firmware version 32.015 from ControlFlash Plus. You should aim to meet the minimum firmware requirement specified for your PLC model.

FAQ: 2. Is it necessary to upgrade to the latest Studio 5000 version if I have firmware version 32 and considering downloading firmware version 32.015 for my CompactLogix PLC?

Answer: - Upgrading to the latest Studio 5000 version is recommended for compatibility and optimal performance. It's advisable to use the corresponding software version that is compatible with the firmware versions you are working with to ensure smooth operation and access to the latest features.

FAQ: 3. What are the potential risks of installing a firmware version lower than the minimum requirement on my CompactLogix PLC?

Answer: - Installing a firmware version lower than the minimum requirement may result in compatibility issues, malfunctions, or even damage to the PLC. It's important to always adhere to the minimum firmware requirements specified by the manufacturer to ensure proper functionality and system stability.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →