Is S7-PLCSIM included in TIA Portal Version 18?

Question:

Hello, I successfully delivered my PLC hardware to the customer site with the help of this forum - thank you! I am exploring the possibility of conducting "offline" updates to the system for when the Operator requires updates without needing the physical hardware present. Upon attempting to start simulation, I encountered an error message prompting the need to install "PLCSIM." I have a question: Is PLCSIM a separate license or is it included in TIA Portal (Version 18)? Any insights on this would be greatly appreciated. Thank you.

Top Replies

After doing some research, I discovered that PLCSIM requires a separate license. As I consider this further, I'm curious about how it will operate, especially since I will need it to simulate 4-20mA analog inputs.

PLCSIM-1200 is an essential component of TIA STEP7 BASIC, while PLCSIM-1200/1500 is a key feature of TIA STEP7 PRO.

Mas01 mentioned that upon searching online, it was discovered that PLCSIM requires a separate license. The concern now lies in how it will function, particularly in simulating 4-20mA analogue inputs. PLCSIM *ADVANCED* is a distinct license essential for additional functionalities such as allowing another simulation tool to control the PLC via an API or enabling network connectivity within the simulation. On the other hand, PLCSIM (regular) is integrated into Portal without the need for extra licensing but requires a separate installation. Further information can be found by scrolling down on the main Step 7 trial install page to access PLCSIM, which supports basic code simulation and connectivity to a simulated HMI on the user's PC.

mk42 mentioned that PLCSIM *ADVANCED* is a separate license required for additional functionalities in simulation, such as integrating another simulation tool via an API or enabling network connectivity. On the other hand, PLCSIM (regular) comes included in Portal without the need for extra licensing, but it requires a separate installation. To access basic code simulation and connect to a simulated HMI on your PC, scroll down on the main Step 7 trial install page to find PLCSIM. It is important to note that there should be no additional costs associated with this installation.

According to JesperMP, PLCSIM-1200 is often included in TIA STEP7 BASIC, while PLCSIM-1200/1500 is typically included in TIA STEP7 PRO. Thank you, JesperMP, for your input. Here is what is currently installed on my system.

Congratulations on your successful delivery! To your question - the PLCSIM comes included with the TIA Portal software without any additional licenses needed, so you should be able to install and use it without issue. Just ensure to check the version compatibility, as compatibility issues could be behind your error message. Hope that helps!

Hey, congrats on the successful delivery! As far as I understand, PLCSIM is included with the TIA portal and doesn't require an additional license. However, PLCSIM and the TIA Portal should ideally be the same version for optimal communication. So, if you're using TIA Portal V18, make sure you've downloaded PLCSIM V18 too. Happy simulating!

Hey there! Congrats on the successful delivery! As for your question about PLCSIM, it is indeed included in TIA Portal, but the specific features available can depend on the license you have. If you're using TIA Portal Version 18, you should have access to PLCSIM, but double-check your licensing as there could be variations, especially with starter or restricted licenses. If it turns out you need a separate license, Siemens has some good resources to guide you through the process. Good luck with your offline updates!

Congratulations on the successful delivery! As for your question, PLCSIM is typically included with the TIA Portal installation, but it might not be activated by default depending on your licensing setup. Make sure to check your installed licenses in the License Management tool; you may need to enable it there. If it's not included, you might have to purchase a separate license. Good luck with your offline updates!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Is PLCSIM included in TIA Portal Version 18?

Answer: - Yes, PLCSIM is included in TIA Portal Version 18 and is used for simulation purposes.

FAQ: 2. Do I need a separate license for PLCSIM?

Answer: - No, you do not need a separate license for PLCSIM as it is included in the TIA Portal software package.

FAQ: 3. How can I resolve the error message prompting the need to install PLCSIM?

Answer: - You can resolve this issue by installing PLCSIM from within the TIA Portal software. Make sure to have the necessary components installed for simulation.

FAQ: 4. Can I use PLCSIM for offline updates to the system?

Answer: - Yes, you can use PLCSIM for offline updates without needing the physical hardware present. This allows for simulation and testing of changes before applying them to the actual system.