Looking for a Reliable Logicmaster LM90 Download Link

Question:

Can anyone help me locate a download link for Logicmaster LM90? I've been searching extensively but have been unsuccessful in finding a reliable source for it.

Top Replies

I have uploaded the file to my Google Drive. Kindly send me your email address via private message, and I will add you to the sharing list. But first, could you explain why you require it? Emerson's latest software, PAC Machine Edition, allows for the uploading of programs generated with Logicmaster from the CPU. If you possess a Logicmaster project file, you can easily import it into PME. However, there are some challenges when using Logicmaster with newer operating systems. One major issue is that Logicmaster's serial driver is not compatible with a 64-bit OS. To work around this, I typically use it within a 32-bit XP virtual machine on my Windows 10 laptop through DOSBox.

The equipment utilized at my workplace is also available for me to use at home, and I am eager to hone my skills with it in a home setting.

Isn't it interesting that you're still using Logicmaster after all these years? Although it may be considered outdated now, this DOS application has its own unique way of navigating through the software using F keys instead of a mouse. The functions triggered by the F keys vary depending on the screen displayed, but the top ten fields on each screen provide a guide for users. The lower half of the field corresponds to the action triggered by pressing the F key, while the upper half corresponds to the action triggered by pressing + F key. Keep an eye out for the "more" label on certain F keys, as it indicates additional functions within the current screen. Best of luck mastering this software!

At my previous job site, we were still utilizing Logicmaster for some functions. There were specific Programmable Logic Controllers (PLCs) that couldn't be updated due to compatibility issues with the outdated firmware on the 9030s. Unfortunately, this limitation prevented us from upgrading them to newer versions.

I understand your frustration. Unfortunately, Logicmaster LM90 is no longer supported or provided by its original developer, and that includes legal download sources. Opting for downloads from unofficial sources may pose security risks. I would suggest considering a transition to a more current software like Proficy Machine Edition, which provides similar functionality and is actively maintained and supported.

I'm not surprised you're having a tough time finding a direct download link for Logicmaster LM90, considering it is outdated software and sometimes can't be fetched easily. Your best bet might be checking out some specialty forums or tech-oriented web communities, like PLCtalk.net or IndustryAutomation. Alternatively, you might want to consider upgrading to a more modern PLC software, if possible, to enhance functionality and support.

It seems like Logicmaster LM90 is a fairly outdated software and therefore finding a reliable download link might be quite a challenge. If you've exhausted your search, perhaps consider looking into upgrading to a more recent version like Proficy Machine Edition. It is compatible with most systems that worked with LM90 and provides better features. However, if you really need LM90, I'd recommend checking out industrial surplus sellers or contacting GE directly, as they often have older software available. Remember, though, using outdated software may pose security risks, so proceed with caution.

Absolutely, I've faced the same difficulty finding Logicmaster LM90 before. I recommend reaching out directly to GE Intelligent Platforms - their customer service helped me locate a download link last time. Remember it's quite dated software though, and may not run smoothly on newer operating systems without running it in some kind of emulation or compatibility mode.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. Question: Where can I find a reliable download link for Logicmaster LM90? Answer: Unfortunately, finding a reliable download link for Logicmaster LM90 can be challenging. It's recommended to check official websites, forums, or contact the manufacturer for assistance.

FAQ: 2. Question: Is Logicmaster LM90 still available for download?

Answer: Answer: The availability of Logicmaster LM90 for download may vary. It's advisable to explore alternative software solutions or contact the manufacturer for the most up-to-date information.

FAQ: 3. Question: Are there any alternative software options similar to Logicmaster LM90?

Answer: Answer: Yes, there are alternative software options available that offer similar functionalities to Logicmaster LM90. It's recommended to research and compare different software solutions to find one that best suits your needs.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →