Looking for AB 1765-L84ES Guard Logix 5580 Safety Controller for PLC and HMI Testing

Question:

Greetings all! I am on the hunt for an AB 1765-L84ES Guard Logix 5580 Safety Controller available online. I am in need of testing my program with a PLC and HMI. If anyone is willing to lend their PLC for a brief period, it would greatly assist me in testing my program and HMI interface. Thank you in advance for your help.

Top Replies

Are you looking to procure a physical Programmable Logic Controller (PLC) or do you need to establish a remote connection to another individual's PLC system?

I am looking to establish a remote connection to my programmable logic controller (PLC) in order to conduct tests on both my PLC program and human-machine interface (HMI) program.

I have an extra one on hand that I can ship to you. Can you please specify how long you anticipate needing it for?

Looking for ways to connect? Could you please provide me with your email address so we can touch base for the next 2-3 days? I want to see how I can perform a PLC & HMI test remotely, as I have never done it this way before. Appreciate your response. Thanks!

You have chosen to overlook my inquiry!

Hey there! I'd suggest checking out websites like eBay, Craigslist or even surplus industrial hardware online stores; they often have a broad range of used or new PLCs. Additionally, have you considered simulating your program using virtual software like RSLogix Emulate 5000? It can mimic the PLC for testing purposes if you can't find the exact model you're looking for. Just offering another possible solution. Good luck with your project!

Hello! While I don't have an AB 1765-L84ES GuardLogix 5580 Safety Controller to lend, I recommend checking out eBay or industrial automation supply sites. They often have used equipment at a reasonable price. Also, consider using PLC simulator software for preliminary testing of your program and HMI interface. Good luck with your project!

Hey there! I totally understand the struggle of finding specific equipment for testing. While I don't have an AB 1765-L84ES to lend out, have you tried reaching out to local automation groups or forums? Sometimes members are willing to share or rent out their gear for short periods. Also, checking out local educational institutions with engineering programs could lead to some leads on a PLC to test with. Best of luck with your search!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. Where can I find an AB 1765-L84ES Guard Logix 5580 Safety Controller for PLC and HMI testing? - You can search for this specific controller online through various industrial automation suppliers or marketplaces.

FAQ: 2. How can I test my program with a PLC and HMI?

Answer: - To test your program, you will need to connect your PLC and HMI to simulate the operation of your system. Make sure to follow the manufacturer's instructions for proper setup and testing procedures.

FAQ: 3. Is it possible to borrow a PLC from someone for testing purposes?

Answer: - Yes, reaching out to the industrial automation community or local businesses might help you find someone willing to lend their PLC for a brief period to assist with your testing needs. Remember to discuss terms and conditions for borrowing the equipment.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →