Need GE Fanuc 90-30 PLC Software for Code Modification and Upgrade

Question:

Hello everyone, I am searching for someone who possesses the necessary software to access a program from a 90-30 PLC. We have recently acquired a new client with an outdated PLC and are in need of a solution to either upgrade the PLC or make modifications to the existing code. I have the code saved on a CD, and a helpful starting point would be a printed copy of the I/O list. Can anyone provide assistance with this? Thank you in advance. - Tommy Improved Keywords: 90-30 PLC software, modify PLC code, production line PLC upgrade, PLC I/O list help

Top Replies

Share the backup file in this thread. I am equipped with Logicmaster 90 software.

Expressing gratitude

Behold the printed document.

I am extremely grateful for this, as it has saved me countless hours of labor trying to trace cables in an outdated control panel. Best regards, Tommy.

Looking for assistance! Can you assist me in return? Thank you in advance! Check out the link below: Kent https://drive.google.com/file/d/1MBf4lWkGMYAV4TPiaZZAJ2ehhcSlGtc3/view?usp=sharing

Hi Tommy, it sounds like you're dealing with quite a task there! You're right, accessing old code from a 90-30 PLC can be tricky, but software like Proficy Machine Edition should be able to help you out, especially with creating a printed version of the I/O list. In terms of making modifications, be very careful - altering ladder logic without full understanding can cause some serious issues. Depending on your budget and the age of the system, it might be safer and more efficient in the long run to upgrade the PLC entirely. That would also let you enjoy the benefits of a modern PLC, such as more seamless integration with newer technologies and software.

Hey Tommy, I've faced a similar issue with an old 90-30 PLC at one of my previous jobs. For accessing and modifying the code, Proficy Machine Edition software is generally the go-to. It supports a range of GE PLCs including the 90-30 series. You can print off your I/O List right from within the software, which should make things easier. As for upgrading the PLC itself, it really depends on the specifics of your setup and requirements. You might want to consult with an automation specialist to see what the most cost-effective option is.

Hey Tommy! I can definitely understand the challenges with older PLCs; they're often tricky to work with. If you haven't already, check out GE's website for their Proficy software, which might support your 90-30. Also, looking into online PLC forums could connect you with someone who has the exact software you need. For the I/O list, if you have the code, you might be able to extract it using the software you do have. Good luck with the project, and I hope you get everything sorted out!

Hey Tommy! I can relate to the struggle with older PLCs—those 90-30s can be tricky to work with due to their outdated software. You might want to check out GE's Proficy Logic Developer, which can handle modifications and might even allow you to extract the I/O list from your existing program on the CD. Additionally, reaching out on forums dedicated to industrial automation could connect you with someone who has the legacy software you need. Good luck with your project!

Hey Tommy, it's great to see you're working on this! For the 90-30 PLC, you might want to check out Proficy Machine Edition or the older Logic Developer packages if you haven't already. They can help you modify the existing code or even transfer it to a more modern setup if needed. As for the I/O list, you might find online forums or groups dedicated to automation helpful—sometimes other users have scans or templates they can share. Good luck with your project!

Hey Tommy, I’ve worked with the 90-30 PLC before, and I may have some resources that could help you out. The software you need is usually the Proficy Machine Edition, which might still be available online or through GE. If you get your hands on that, you should be able to edit the existing code. As for the I/O list, if you can’t find a printed version, you might want to look through any remarks in the current code or even contact the previous owner of the PLC—they might have kept records. Good luck with the client!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. How can I obtain the GE Fanuc 90-30 PLC software for code modification and upgrade?

Answer: - Answer: You may be able to acquire the necessary software through authorized GE Fanuc distributors or online platforms specializing in industrial automation software.

FAQ: 2. Is it possible to upgrade an outdated 90-30 PLC or should I focus on modifying the existing code?

Answer: - Answer: Upgrading the PLC may provide long-term benefits, such as improved functionality and compatibility with modern systems, while modifying the existing code can be a more immediate solution.

FAQ: 3. Where can I find assistance in obtaining a printed copy of the I/O list for the 90-30 PLC?

Answer: - Answer: You can reach out to GE Fanuc support, online forums dedicated to PLC programming, or industrial automation professionals who may have access to the necessary documentation.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →