PanelView Plus 7 Touchscreen Replacement Parts - Affordable Solution Available

Question:

After accidentally breaking the glass on our new PanelView Plus 7 just two months post-installation, our vendor informed us that we couldn't purchase the necessary repair parts - namely the Touch Panel Glass and Protective Film FIT 1000 2711P-T10C22D9P-B - from them. However, they did offer to repair it for a steep price. Seeking a more cost-effective solution, we discovered the same parts listed online for a fraction of the cost. Has anyone had success using third-party parts for their PanelView Plus 7 repairs? Taking matters into our own hands, we decided to order the parts and attempt an in-house repair, following a tutorial we found on YouTube titled "How to Repair 2711P-T10C22D9P Panelview Plus 7 Protective film Touchscreen Panel LCD Display." #Allen-Bradley #PanelView 1000 Plus 7 Touchscreen Replacement 2711P T10C22D9P.

Top Replies

If you're looking for quality parts at affordable prices with reliable availability, I highly suggest checking out plccable.com. This online store is managed by an active forum member who has a strong reputation for providing excellent products. I have personally used their parts for repairs and can attest to their quality and ease of use.

Purchase a replacement panelview from Plccable.com for your repair needs. I successfully fixed a panelview by using a version from eBay, despite it not having an Allen Bradley (AB) label on the bezel. It is common for people to seek replacements from original manufacturers, as AB does not produce their own hardware. Remember to use electronics-safe silicone sealant when reinstalling the new glass, as this essential item is typically not included in replacement kits.

Our company utilizes accessories from Vicpas, known for their high-quality products and excellent service. For more information, visit their official website at www.vicpas.com.

Although I have not repaired a PV touch panel before, I have experience with repairing other types of panels. The cost of repairs can be high, but it can also be time-consuming. One situation that particularly frustrated me involved a Siemens TP panel with a smashed touch screen. Many companies said it couldn't be repaired because the touch panel was no longer in production due to ROHS compliance. The replacement offered by the machine supplier was significantly more expensive than a new unit. However, after researching and reaching out to the manufacturer, I was able to locate some old stock through their agents for a much more reasonable price. By purchasing and installing the replacement parts myself for just £50 each, along with an hour of my time, I was able to successfully repair the panel at a fraction of the cost quoted by repair companies. It was a simple and cost-effective solution compared to the alternatives, which ranged from £2,700 to £4,000.

Arpus4KM mentioned that kits for replacement do not include small tubes. Thank you for the suggestion. We may look into providing small tubes as well. We currently have both the overlay and glass in stock and can ship them out today. Check out our selection of Allen Bradley PanelView PLUS 7 1000 2711P-T10C22D9P Glass Digitizer and Overlay at plccable.com. We also offer PLC Cables, PLC Trainers, and Industrial Automation Supplies.

I've had a somewhat similar experience with my PanelView Plus 7 as well. I can tell you that using third-party parts can certainly be a more wallet-friendly option, but be wary, as quality can sometimes be inconsistent. You did the right thing by researching and finding a reliable tutorial for guidance, since any improper handling might further damage the screen. Give it a shot, and don't rush the process. If things don't work as expected, a professional repair might be the more prudent route to consider, even if it comes at a higher cost. Best of luck with your in-house repair! #DIYRepair #PanelViewPlus7

I've had a similar experience with our PanelView Plus 7 - believe it or not, an errant coffee cup was the culprit. We also opted for third-party parts coupled with some handy internet guides, and quite frankly, the process was straightforward with satisfactory results. Do ensure you invest in a decent set of tools - the right screwdriver is worth its weight in gold. Also, it might be a good idea to have a second person on standby to assist during the repair. This can make a huge difference, especially if it's your first time dabbling in DIY electronics. Good luck with the repair!

Sounds like you're taking a calculated risk, which could potentially save your company significant cost in the long run. I've used third-party parts for my PanelView Plus 7 in the past and so far, it's been successful. Just ensure you're purchasing parts from a reputable online source and the part numbers are absolutely identical to what's needed for your particular model. And props to you for taking the DIY route - the YouTube tutorial you're reference is solid and quite easy to follow. However, one thing I learned is that patience is key, especially when handling the LCD display. Good luck with your repairs! #DIY #PanelViewRepairs.

It's great to hear you're taking the DIY route! I've had a similar experience with a PanelView display, and I went with third-party parts as well after being quoted a high repair fee. The quality was surprisingly good, and the repair went smoothly following a good online tutorial. Just make sure to double-check compatibility and possibly reach out to others in forums for tips specific to your model. Good luck with your repair—hope it turns out as well as mine did!

It sounds like you're taking a smart approach by exploring alternative repair options! I've had a similar experience where I found third-party parts for my PanelView, and while there can be some risk involved, the savings were substantial. Just make sure to double-check compatibility and maybe look for reviews on the parts before diving into the repair. Good luck with the in-house fix—those YouTube tutorials can be lifesavers!

It's great to hear you're taking the DIY route! I had a similar situation with my PanelView Plus 7 and ended up using third-party parts as well. While I was a bit hesitant at first, it turned out to be a successful fix, and the touchscreen has worked flawlessly since. Just make sure you follow the tutorial closely and take your time with the reassembly—these things can be tricky! Good luck with your repair; it’s always satisfying to fix it yourself!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Can I use third-party parts for PanelView Plus 7 repairs?

Answer: - Yes, it is possible to use third-party parts for PanelView Plus 7 repairs as long as they are compatible with the device. However, ensure that the quality and specifications of the parts meet the required standards to avoid any issues.

FAQ: 2. Where can I find affordable replacement parts for PanelView Plus 7 touchscreens?

Answer: - You can search online for suppliers that offer affordable replacement parts for PanelView Plus 7 touchscreens. Make sure to verify the credibility of the supplier and the quality of the parts before making a purchase.

FAQ: 3. Is it feasible to attempt an in-house repair of a PanelView Plus 7 touchscreen?

Answer: - Yes, it is feasible to attempt an in-house repair of a PanelView Plus 7 touchscreen, especially if you have access to the necessary replacement parts and a guide or tutorial to follow. Just ensure you have the required skills and tools to carry out the repair effectively.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →