Powerflex 525 Drives: Compatibility Between No Filter (104) and With Filter (114) Explained for CCW Software

Question:

Subject: Clarification Needed on Drive Compatibility for Panel Build Good Afternoon, I prefer to standardize all spare drives used in the plant for consistency. Currently, I am working on a project and, although I ordered my drives a few months ago, I have just begun constructing my control panel. I realized that I mistakenly ordered the wrong model number for one of the drives. Specifically, I ordered the Powerflex 525 5 HP models: 25B-D010N104 (without filter) and 25B-D010N114 (with filter). My question is regarding compatibility: If I need to swap the 104 model for the 114 (the one with a filter), will the Control Config software (CCW) recognize this as a mismatch and prevent me from loading the parameters? Conversely, if I were to do the opposite, would it overlook this difference as a minor detail? Thank you in advance for your assistance!

Top Replies

Cydog stated, "Good Afternoon! I prefer to standardize all the spare drives within the plant. I’m currently working on a project, but after placing my order for drives several months ago, I’ve started assembling my panel. I’ve realized that I mistakenly ordered the incorrect drive numbers. For instance, I ordered the PowerFlex 525, model 5 HP, with the part numbers 25B-D010N104 (No Filter) and 25B-D010N114 (With Filter). My question is: if I need to replace a 104 with a 114 (With Filter), will CCW recognize this as a mismatch and prevent me from loading the parameters? Alternatively, will it see this as a minor issue and allow me to proceed? Thank you in advance!" To clarify: there are no differences in parameters or firmware between the filtered and unfiltered versions.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →