Proface HMI GP4402-WW Software Compatibility Issue Solution

Question:

Looking for programming software compatible with the GP-4402WW HMI by Proface? Although I have GX Pro EX 4.07.101 and V4.06.300, it seems that the GP 4402 model is not available in the selection menu for these versions. However, it is available in GX Pro V4.06.200. Can anyone provide a link where I can download the necessary software?

Top Replies

Versions 4.03 and newer now support GP4x02WW. If you're still experiencing issues, the solution is to run the "YTSetup.exe" file located in "C:\Program Files\Pro-face\GP-Pro EX 4.08\OP\". This will run a command prompt without any dialogue. After restarting the software, you should see GP4402 displayed in the list of available options.

I am experiencing a similar problem where the file mentioned is not found in the original poster's folder. Are there any additional solutions that can be recommended?

To utilize the Proface HMI GP4402-WW/GP4502-WW, the necessary software must be installed. Adjust your folder settings to display hidden files, as they may be categorized as such for unknown reasons.

Kongzai mentioned that versions 4.03 and later of GP-Pro EX support GP4x02WW. If you are facing a problem opening a GP4501WW panel, you can resolve it by running "C:\Program Files\Pro-face\GP-Pro EX 4.08\OP\YTSetup.exe" once. This will trigger a command prompt to run without showing a dialog. After restarting the software, you will see GP4402 in the list of options. I apologize for revisiting an old post, but I want to confirm the effectiveness of this solution and express my gratitude. Upgrading to version 4.09 did not resolve the issue, but running the Language Resource Installer (YTSetup.exe) as instructed made the file accessible. Despite being able to communicate with the panel, the software was initially unable to open the file due to an unsupported display unit error.

In the future, if you need to open the ytsetup, you can now easily locate it in the designated folder.

I had a similar issue and found that the V4.06.200 version of the software works best for the GP-4402WW model. Unfortunately, Proface doesn't provide direct links for software download via public channels due to their license policy. I'd advise contacting their support team directly on their official website or reach out to your local Proface representative; they'll be able to give you access to the required version.

You're right about the compatibility issues between the GP-4402WW model and the versions of the software you currently have. Proface has different software versions tailored specifically for different models. You can find the GX Pro V4.06.200, which is compatible with your model, on the official Proface website under the software downloads section. Always remember to ensure the source of your download is legitimate to prevent unwanted software issues.

Sure, I've come across a similar issue before. For the Proface GP-4402WW HMI, you might need to upgrade your version of GX Developer. From what I understand, your versions of GX Pro EX 4.07.101 and V4.06.300 might not have the necessary drivers for this particular model. Unfortunately, I don't have the download link, but check out the official Proface website or their technical support for the latest version. They often provide updates for their software range and it should support your model too!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. Q: Which programming software is compatible with the Proface GP4402-WW HMI? The GP4402-WW HMI is compatible with GX Pro EX V4.06.200.

FAQ: 2. I have GX Pro EX 4.07.101 and V4.06.300, but the GP 4402 model is not available in the selection menu. What should I do?

Answer: If you are unable to find the GP 4402 model in GX Pro EX 4.07.101 and V4.06.300, try using GX Pro V4.06.200 where it is available.

FAQ: 3. Where can I download the necessary software to program the Proface GP4402-WW HMI?

Answer: You can download the required software, GX Pro V4.06.200, from the official Proface website or other authorized sources.