Programming Schneider HMISCU: Software, Logic, and Annotations Explained

Question:

As an experienced PLC engineer, I have extensive knowledge of programming the AB PLC5, 5.02, and control logix systems. Currently, I am working on a project that involves the Schneider HMISCU. I have a few inquiries regarding this project: 1. Can you please provide information on the necessary software required for programming both the logic and HMI of the Schneider HMISCU? 2. The client does not have a copy of the program installed. I am curious if the annotations are stored onboard the HMISCU, or if I upload the program, will I only receive the raw logic without any comments? Any assistance on these matters would be greatly appreciated. Thank you in advance for your help. Keywords: PLC engineer, AB PLC5, control logix, Schneider HMISCU, programming, logic, HMI, software, annotations, comments.

Top Replies

To successfully program your industrial machinery, you must have EcoStruxure Machine Expert software, previously known as SoMachine. This software is a combination of two separate programs: Machine Expert for the PLC portion and Vijeo Designer for creating HMI screens. It is crucial to ensure a specific setting is selected in Vijeo Designer in order to upload the software for the HMI side, just as it is necessary for the PLC side of programming.

Thank you for getting back to me, HMISCU Schneider. So, if the previous programmer has set certain bits, does that mean that the HMI and Logic settings can never be accessed again? If that's the case, it may be necessary to remove and replace them with a more sustainable solution. In addition, could you clarify whether annotations such as tags, labels, and descriptions in the logic are included in the downloaded code and if they can be unloaded as needed? Your response is greatly appreciated.

Are HMISCUxB5 3.5 inch and 5.7 inch displays programmed the same way in Vijeo Designer? It seems there is no option to choose the size of the HMI when configuring HMISCUxB5. Can someone provide guidance on this matter?

From my experience, you'll require Schneider's software package called SoMachine for programming the logic and Vijeo Designer for the HMI part while working with HMISCU. As for your second question, when you upload the program, regrettably, you will only receive the raw logic without any comments because the annotations are not stored onboard the HMISCU. They are merely stored in the development environment of the software from where the program is downloaded. Hope this helps!

From my experiences working with the Schneider HMISCU, you'd need the SoMachine and Vijeo Designer software for logic and HMI programming respectively. As per your second question, unfortunately, unless previously exported and saved separately, the annotations/comments don't get stored on the HMISCU. On uploading the program, you will only receive the raw logic without any comments. It's always a good practice to maintain a backup of the annotated version for future troubleshooting or modifications.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. What software is needed to program both the logic and HMI of the Schneider HMISCU?

Answer: - To program both the logic and HMI of the Schneider HMISCU, you will need EcoStruxure Machine Expert - Basic software.

FAQ: 2. Are annotations stored onboard the HMISCU, or will I only receive raw logic without comments when uploading the program?

Answer: - Annotations are typically stored within the program file itself. When you upload the program, you should receive both the logic and any associated comments or annotations.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →