Repurposing Fagor CNC 8055: Programming Options and Cost Analysis

Question:

I’ve been approached to take on a unique project for one of my clients involving a Fagor CNC machine, specifically the 8055 model. They are interested in repurposing this equipment. Given my knowledge of G-code, I agreed to help. My primary goal is to determine whether it's possible to program this CNC machine using a PC, rather than manually inputting commands via the keypad. I've thoroughly examined both the front and back of the unit and couldn't find any indications of an easy programming solution. While there's a USB symbol located on the front, the absence of a USB port underneath the cover leads me to believe that it may have been an optional feature that wasn't included in this unit. Currently, I'm working on obtaining a quote, and there's a notable difference in the cost if I can program using a text file, compared to having to input everything directly on the control panel. The control panel looks similar to the one shown in the image below.

Top Replies

I recently searched for the model name and number of the machine online, as I was unfamiliar with it. During my search, I discovered a website that hosts the operational manual in a digital format. According to the manual, the device appears to support Ethernet connectivity, enabling direct file management through protocols like FTP and NFS with an external hard drive. Additionally, the manual references a program called WinDNC, which is designed for use on Windows computers. However, it’s worth noting that the manual specifically mentions compatibility with older versions of Windows, including 95, 98, 2000, and XP, which may pose challenges for modern usability.

Ozpeter shared, "I recently searched for the machine's name and model number online (having never encountered one before) and discovered a website hosting the operations manual. It suggests that the device should have Ethernet connectivity, enabling direct file management via FTP or access to an NFS-connected hard drive. Additionally, the manual references a software called WinDNC, which appears to operate on Windows systems. However, it only mentions compatibility with older Windows versions, including 95, 98, 2000, and XP, making it potentially challenging to run on modern systems. I noticed this discrepancy but would prefer insight from someone who has actual experience using this machine. Fagor’s response has been slow, and they haven't provided any comprehensive information yet."

Would you prefer to gradually introduce data or upload an entire program directly from your post-processor?

Gas stated: "Are you looking to either gradually feed the data or directly upload a G-code program from a post-processor?" For my needs, I prefer to create the G-code offline and then transfer it into the processor seamlessly.

Numerous vintage 86 machines were equipped with a standard motherboard, making it highly probable that you can connect a 3.5-inch floppy drive. It’s advisable to consult with software solutions like MasterCAM to avoid duplicating efforts. Many companies that operated in the posting industry during that era continue to offer support for these legacy systems, as a significant number are still in use today.

It sounds like an interesting challenge! For the Fagor 8055, while options might be limited, you could explore using software like Fagor's own G-code graphical programming tools, if available, or consider third-party solutions that might allow you to transfer files. Sometimes, older machines can be retrofitted with a serial or Ethernet connection, which would let you stream G-code directly from your PC. It might also be worth reaching out to Fagor or user forums for advice on upgrades or modifications that other users may have successfully implemented. Good luck!

It sounds like you’re diving into an interesting challenge with the Fagor 8055! A lot of older CNC machines can be a bit tricky when it comes to interfacing with PCs, especially if they lack straightforward USB connectivity. Have you checked if there are any software options or third-party solutions that could allow you to upload G-code files directly? Sometimes manufacturers have hidden features or there are community-developed solutions that can help. It might also be worth reaching out to Fagor support or forums to see if anyone else has navigated a similar situation. Good luck, and I hope you find a cost-effective solution!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →