Request for GE Fanuc RX3i PLC CPU IC695CPU315 Firmware Version 5.0

Question:

I am looking for firmware version 5.0 for the GE Fanuc RX3i PLC CPU, model IC695CPU315. If anyone has access to this specific firmware, please share it with me. Currently, my PLC is running on firmware version 7.0, and I need to downgrade it to 5.0. You can reach me via email at [email protected]. Thank you!

Top Replies

I believe there isn't a version available for that. What are your reasons for considering a downgrade?

If you're seeking an earlier firmware version for your CPU due to using Proficy Machine Edition version 5.0, it's important to note that, unlike Allen Bradley, General Electric (GE) does not link CPU firmware with programming software versions.

Thank you for your response. One of our clients is experiencing difficulties in reading user-defined type (UDT) items from a GE Rx3i PLC while utilizing Wonderware SCADA software. They are specifically working with a CPU310 that operates on firmware version 5.0. In my attempts to duplicate this issue, I used a CPU305 with firmware version 8.96 and a CPU315 with firmware version 7.0, but I was unable to replicate the problem. With the latest firmware version, everything functions smoothly. Therefore, I would like to conduct further testing with the older firmware version 5.0 to identify the root cause of the issue.

Visit the official GE website to access important resources. Please note that registration is free but required for download. Check out this link: [GE Download Page](https://ge-ip.force.com/communities/en_US/Download/IC695CPU315-PACSystems-RX3i-CPU-DN). The latest firmware version available at this time is 8.15. You may need to consider upgrading your customer's firmware to this version for optimal performance.

Downgrading firmware on a GE Fanuc RX3i PLC can be tricky, especially since version 5.0 might be harder to come by. Have you checked with your local GE support or any online community forums dedicated to automation? They sometimes have archived versions available or can guide you through the process. Good luck!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Why would someone want to downgrade their GE Fanuc RX3i PLC CPU firmware from version 7.0 to version 5.0?

Answer: - Downgrading firmware might be necessary for compatibility with older systems, software, or specific applications that require the older version. In some cases, users may need to maintain consistency across multiple devices or setups that have not been updated.

FAQ: 2. Is it possible to obtain older firmware versions for GE Fanuc RX3i PLC CPUs like the IC695CPU315?

Answer: - Yes, it is possible to obtain older firmware versions, but they may not be readily available through official channels. Users may need to contact GE Fanuc support or reach out to the community or colleagues who might have archived versions.

FAQ: 3. What are the risks associated with downgrading PLC firmware?

Answer: - Downgrading PLC firmware can lead to compatibility issues with existing configurations, potential loss of features or improvements offered in newer versions, and the possibility of introducing bugs that were resolved in later versions. It is important to evaluate these risks before proceeding with a downgrade.

FAQ: 4. How can I contact someone who might have the firmware version I need?

Answer: - You can reach out to forums, user groups, or professional networks related to GE Fanuc products

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →