Schneider Magelis 5330 Display Backlight Issue: Replacement Options

Question:

Hello everyone, we are facing a minor issue with our Schneider Magelis display. The back light has burnt out, making it challenging to operate. Spare parts for this Earth (model number xbtzg45b) are no longer available as production has ceased for a few years. Has anyone successfully replaced the back light on these screens using a universal LED kit with an inverter, or what is the recommended course of action in this situation? While this is an older model and upgrading to a newer one is ideal, retrieving the software is not possible and a temporary back light fix is a more cost-effective solution. Your insights and suggestions are appreciated. Thank you.

Top Replies

The initial search result on Google can be found at this link https://www.euautomation.com/uk/schneider/product/xbtzg45b, offering the Schneider Electric XBTZG45B product. This website is a valuable resource for finding specific Schneider Electric products like the XBTZG45B.

I reached out to Parky and seven other companies with a query for parts, but unfortunately, none of them had the parts I needed in stock.

When in a hurry, we opted for generic 24V white LED strips with adhesive backing as a quick fix. By removing the CCFL and installing the LED strips powered by the 24V source for the HMI, we were able to drastically improve screen clarity. The powerful LED strips make the screen perfectly legible, even when not perfectly aligned with the diffuser. Give it a try - these affordable strips can make a significant difference in display quality.

In Thread 15 about Magelis and Vijeo struggles, I encountered an issue with the backlight. I decided to open the panel and replace it with a more reliable LED strip, powered externally. Surprisingly, the new setup works seamlessly. It's puzzling why manufacturers continue to use the unreliable current backlights that often fail.

Greetings everyone, I wanted to provide a quick update on a recent project. We recently installed high-powered LED strips that are powered externally by 24V. However, we encountered a few issues along the way. The brightness of the LEDs caused them to burn out quickly due to excess heat, so we had to install a dim adjuster and set it to the lowest setting. This solved the issue. Another problem we are facing is an error message on the screen indicating that the backlight is burned out and in need of maintenance. This error message not only stays on the screen but also locks it completely. We only have about 8 seconds to make adjustments on the panel before it locks up and requires a reboot. If anyone has any tips or ideas on how to work around this issue, your input would be greatly appreciated. Thank you.

Hey there, sorry to hear about your Magelis display trouble. I faced a similar challenge with an old Mitsubishi panel a while back. I managed to replace the burnt out back light with a universal LED kit and it worked quite well for a while. The key factor to keep in mind is to choose an LED strip with the appropriate power and light intensity to match your original specifications. Also, a CCFL-to-LED conversion kit might be something to consider, it's designed to do exactly what you're trying to accomplish. But remember, as with any workaround, it comes with its own risks. Always unplug all electrical connections while working and reconnect once you're done. Stay safe!

Hey there! I totally understand your frustration with the burnt-out backlight on the Magelis display. While sourcing original parts is tough, some users have had luck with universal LED kits, especially if you can find one compatible with your model's specs. Just make sure the inverter matches the voltage requirements to avoid any further issues. If that doesn't pan out, you might want to check out any local repair shops or online forums specializing in older equipment; they sometimes have creative solutions or even refurbished parts. Good luck, and I hope you find a quick fix!

Hey there! I totally understand your dilemma with the Magelis display; it’s frustrating when spare parts are no longer available. If you're considering a universal LED kit, I've seen some folks have success by carefully disassembling the display to replace just the backlight, but be mindful of the risk of damaging other components. You might want to look into DIY tutorials specific to your model on platforms like YouTube—sometimes, a creative solution is just a quick search away. Also, reaching out to tech forums or groups dedicated to industrial equipment might connect you with someone who has tackled a similar issue. Best of luck!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Is it possible to replace the back light on a Schneider Magelis 5330 display with a universal LED kit?

Answer: Yes, replacing the back light with a universal LED kit and inverter is a possible solution for screens like the Schneider Magelis 5330 when original spare parts are no longer available.

FAQ: 2. What is the model number of the display mentioned in the discussion thread?

Answer: The model number of the display mentioned is xbtzg45b.

FAQ: 3. Why is upgrading to a newer model not feasible in this situation?

Answer: Upgrading to a newer model is not feasible in this situation because retrieving the software is not possible, making a temporary back light fix a more cost-effective solution.

FAQ: 4. What is the recommended course of action for replacing the back light on a Schneider Magelis 5330 display?

Answer: The recommended course of action is to consider using a universal LED kit with an inverter as a replacement for the burnt-out back light on the Schneider Magelis 5330 display.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →