Seeking Manuals and Resources for Reliance VZ3000 Drive and DDS Motion Control System

Question:

I'm currently assisting a client in restarting a production line. They utilize a flying shear system powered by a servo motor, which is controlled by a Reliance Electric VZ3000 drive equipped with a DASR-1 control card and a DDS-CR motion control card. Unfortunately, the client lacks any operational manuals or descriptions and only has the hardware schematic available. I’ve been unable to locate any documentation for these specific products online. If anyone has digital copies of the manuals or relevant resources for these devices, I would greatly appreciate your assistance. Thank you!

Top Replies

RollingPin mentioned: I’m currently assisting a client in the process of restarting a production line. They utilize a flying shear that operates with a servo motor, which is controlled by a Reliance Electric VZ3000 drive, featuring a DASR-1 drive control card and a DDS-CR motion control card. Unfortunately, the client lacks any manuals or operational guides—only a hardware schematic is available. I've been unable to locate any documentation pertaining to these products online. If anyone can provide me with digital copies of the manuals for these devices, I would greatly appreciate it. Thank you! For additional information, you can visit this link: https://www.reliance-electric.co.jp/dl/vz3000/

I’m facing the same issue with this machine as well. Have you found any solutions or made any progress?

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →