I need to connect two remote ethernet devices to a switch in my control panel while ensuring a neat installation. Typically, the customer provides a single shielded ethernet cable terminated with a plug, with each remote device using half of the pairs. I am looking for a solution to adapt the pairs back to two ethernet cables for both to connect to the switch. While I have found devices that could work with couplers and punchdowns, I am hoping to find a single unit that can handle it all in one go. I am looking for a product that can provide the same electrical setup as this Tripp Lite one, but with jacks and DIN rail mounting similar to this SourceASI product (note that the latter has all pairs wired together, which is not suitable for ethernet). If anyone has a product recommendation in mind, please share.
To clarify, the customer has provided an Ethernet cable where one device utilizes the standard Ethernet pairs 1/2 and 3/6, while another device uses the unused pairs 4/5 and 7/8 on the same cable. To resolve this, you can use an RJ45 splitter in combination with custom-terminated Ethernet cables. These splitters work by paralleling the signals, so it's essential to create two custom Ethernet cables that correctly terminate the wires on each end. For instance, one cable should terminate pins 1/2 and 3/6 on both ends, while the other cable should terminate pins 4/5 and 7/8 on one end and pins 1/2 and 3/6 on the other end.
jschulze explained that the customer provided an Ethernet cable where one device uses standard Ethernet pairs 1/2 and 3/6, while another device uses the unused pairs 4/5 and 7/8 on the same cable. Yes, this setup should work. jschulze suggested using an RJ45 splitter along with custom-terminated Ethernet cables to keep the setup neat and organized for the team. The RJ45 splitter simply parallels the signals, so two custom Ethernet cables will need to be created to terminate the proper wires on each end. However, jschulze noted that the first link provided leads to a product that correctly maps the connections as indicated on the sticker, allowing the use of regular patch cables. The preference is for the DIN-rail and jacks version form-factor from the second link.
Modiconguy mentioned that the first link provided leads to a product that accurately performs custom mapping, as displayed on the sticker. This solution would allow the use of regular patch cables. The preferred option is to have the DIN-rail and jacks version form-factor from the second link. This unique RJ-45 splitter design is unfamiliar to me but may pose difficulty in locating. It seems Eaton only offers this specific custom wiring option. If DIN rail compatibility is not a necessity, consider using the Eaton Tripp Lite adapter along with an RJ-45 female to female coupler like the one found here: https://www.monoprice.com/product?p_id=7283.
I have relied on these couplers in various situations, bringing one along whenever I visit clients. They have proven to be indispensable, allowing me to avoid the need to lug around a lengthy 100-foot cable multiple times.
Have you tried searching "Din Rail Mount" on Google? You may find the 2nd item useful for your needs.
Indeed, it seems like you're searching for a pretty niche product combining the features of two different units. Using premade units like the Tripp Lite and SourceASI would generally be simplest, but it appears they lack some critically needed features. Have you considered contacting a custom solution provider? Companies like Phoenix Contact or Mencom might be able to offer customized industrial ethernet solutions that can meet your specialized requirements effectively, including ethernet separation, DIN rail mounting, and adequate jacks.
I'd suggest checking out the Phoenix Contact Ethernet splitter. It seems to meet most of your requirements, as it is a single unit that splits one Ethernet input into two outputs and also supports DIN rail mounting. It's a robust piece of kit, designed precisely for industrial environments. Just make sure that the Ethernet cable provided by your customer can support the splitting without a significant drop in signal quality or speed. Also, although it's a bit pricey, the convenience and neatness of the installation might outweigh the cost.
Have you considered looking into Ethernet switch modules that are designed for DIN rail mounting? Some manufacturers offer small managed or unmanaged switches that can take a single Ethernet input and distribute it to multiple outputs, all while maintaining the correct wiring configurations. Brands like Moxa or Phoenix Contact might have units that fit your requirements, giving you the neat installation you’re after without needing separate punchdown blocks or couplers. Just make sure to check the specs to confirm it can handle the necessary shielding and power over Ethernet if that's part of your setup!
✅ Work Order Management
✅ Asset Tracking
✅ Preventive Maintenance
✅ Inspection Report
We have received your information. We will share Schedule Demo details on your Mail Id.
Answer: - While there are products available with couplers and punchdowns, the user in the discussion is looking for a single unit solution that can adapt the pairs back to two ethernet cables for both devices to connect to the switch neatly.
Answer: - The user is looking for a product that can provide the same electrical setup as the Tripp Lite product, but with jacks and DIN rail mounting similar to the SourceASI product. It's important that all pairs are not wired together to ensure compatibility with ethernet.
Answer: - In scenarios where a single shielded ethernet cable terminated with a plug is provided by the customer, and each remote device uses half of the pairs, a solution is needed to adapt the pairs back to two ethernet cables for proper connection to the switch while maintaining a neat installation.
Answer: - The user is seeking recommendations for a product that can handle the task of splitting RJ45 jacks to connect two remote ethernet devices to a switch in a single unit, while meeting
Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.