TP1900 HMI Screen Turns Off After 13 Seconds - Runtime Stop Issue

Question:

Hello, I am encountering a problem with my TP1900 HMI where the screen works fine after downloading the program for the first time. However, when any modifications are made or the HMI screen is downloaded again, it displays for 13 seconds before the Runtime turns off automatically. This issue persists in simulations as well. No errors occur during compilation of both hardware and software. I am using TIA V17. Could you please provide advice on how to resolve this issue? Best regards, Balajiram

Top Replies

Hello, I have encountered a strange problem recently. To resolve it, make sure you are using the latest update of TiaPortal V17, preferably update 5. Additionally, be sure to install the image panel update on your PC and update the firmware of the HMI. Before downloading, ensure to compile all aspects of the project as sometimes a simple compile may not be sufficient. You can skip the update and directly attempt to compile all components. Thank you, gigiA.

Hey Balajiram, this sure sounds like a tricky issue. One thing you might want to look into is whether the system's power settings are configured correctly. Sometimes, settings that cause your system to sleep or shut off after a certain period of inactivity may be interfering with your HMI runtime. Also, ensure your device's IP address doesn't conflict with another device on your network. Lastly, you may want to consider upgrading to TIA V17 Update 1 if you haven't already, as that update resolved a number of stability issues. Hope this helps!

Hey Balajiram, I've encountered a similar issue in the past. Essentially, this may be happening due to a software glitch or a memory overflow. As an initial step, I'd recommend verifying that you're running the latest firmware update for your TP1900 HMI, as there may have been patches to address such issues. If you're already running the latest firmware, you might want to try performing a factory reset of your HMI before downloading the modified program, just to ensure any old or incompatible configurations are not lingering in the system. Always remember to backup your projects before you do this. Lastly, if nothing else works, consider reaching out to Siemens technical support for professional assistance. Hope this helps!

Hi Balajiram, it sounds like you're dealing with an annoying issue here. I had a similar problem a few years back. In my case, the issue was resolved by updating the firmware of the HMI to the latest version and ensuring that the version of my TIA Portal matched the HMI firmware. Remember to backup your project before attempting any updates. If this doesn't resolve the issue, it may be worth checking if the HMI Hardware Support Package (HSP) in TIA Portal is up-to-date. Hope this helps you out.

Hi Balajiram, it sounds frustrating to deal with that issue! One possibility could be that the memory allocation or runtime settings aren’t adjusted to accommodate the changes you’re making. I’d recommend checking the project settings for specific configurations that might be affected by the updates. Also, ensure that your HMI firmware is up to date, as that might resolve unexpected behaviors. If everything seems fine on your end, consider reaching out to Siemens support—they might have encountered similar cases that could provide more targeted solutions. Good luck!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Why does my TP1900 HMI screen turn off after 13 seconds when the program is modified or re-downloaded?

Answer: Answer: This issue could be related to a Runtime stop problem, which may be triggered by certain changes in the program or the downloading process.

FAQ: 2. How can I troubleshoot the TP1900 HMI screen turning off issue after 13 seconds?

Answer: Answer: To troubleshoot this problem, you can check for any specific changes made during programming, review the Runtime settings, verify the compatibility with TIA V17, and ensure there are no compilation errors in both hardware and software.

FAQ: 3. Is there a solution to prevent the TP1900 HMI screen from automatically turning off after 13 seconds?

Answer: Answer: Possible solutions may include adjusting the Runtime settings, checking for any conflicting configurations, ensuring proper compatibility with the software version, and verifying the integrity of the program download process.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →