Trouble finding edit zones in Logix Designer despite Edits Present indicator.

Question:

I am having trouble finding edit zones within all routines despite fulfilling other criteria, as the search results show no matches. However, the "edits present" indicator still appears at the top. Has anyone else experienced this issue?

Top Replies

Are you in possession of the complete offline software program? It is plausible that the Original Equipment Manufacturer (OEM) may have safeguarded certain routines that they do not disclose, and one of these could contain an edit within it.

The project has been modified by another user. Are multiple terminals currently active, making adjustments?

I personally conducted a test online using two separate computers. If another user makes unauthorized edits while you are uploading or offline, you may be disconnected. Are there any other programmers on your website? Is the PLC connected to the internet?

If your search is limited to ladders, consider exploring alternative options for your project needs.

Thank you for the responses, everyone. I am currently in the process of converting a PLC 5 program to a Control Logix one while offline. This involves consolidating the operations of a PLC 5 system into a Control Logix system that is already up and running. I encountered a similar issue when I installed the last PLC, where I had trouble locating edit zones within the program despite them being present. The Find function was not functioning properly, so I had to manually scroll through to identify them.

It seems like a software glitch to me. I experienced a similar issue a few months ago in my application. Re-indexing the routines did the trick for me. Try that, it might help. Also, make sure your search parameters are correct and if the problem persists, it might be worth reaching out to customer support.

I totally get your frustration; I've encountered similar issues where the search results don't align with the edit indicators. Sometimes, it helps to clear your filters or try different keywords in your search. Also, check if there are any hidden formatting settings that might be affecting your visibility of those edit zones. It can be tricky, but a fresh approach often does the trick!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. Q: Why am I having trouble finding edit zones in Logix Designer despite the "edits present" indicator showing at the top? If you are unable to locate edit zones even though the "edits present" indicator is visible, it could be due to a search error or specific criteria not being met. Double-check your search parameters and ensure all conditions are fulfilled.

FAQ: 2. What should I do if the search results in Logix Designer show no matches for edit zones despite edits being present?

Answer: In such cases, it is recommended to review your search settings, refine the search criteria, and consider any potential filters that may be affecting the results. Additionally, verify that the edits you are looking for are within the specified routines.

FAQ: 3. Has anyone else encountered difficulties in locating edit zones within routines despite the presence of the "edits present" indicator in Logix Designer?

Answer: If you are facing challenges similar to this issue, it may be helpful to seek assistance from other users who have experienced the same problem. Collaborating with peers or reaching out to technical support can provide insights or solutions to resolve the issue.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →