Troubleshooting 1756-IF16 Compatibility Issue with 1756-L1 5550 Processor

Question:

Hello everyone, I am seeking confirmation on the compatibility of the 1756-IF16/B module with the 1756-L1 5550 processor (13.24). I recall reading about this in a manual, but I am having trouble locating the information. I am encountering error 16#0130 and the cards are faulted. I plan to investigate further tomorrow since downtime is limited. I am also considering acquiring a spare 1756-L71 5570 processor as it may be a better solution. According to Rockwell's compatibility checkers, there should not be any issues. The cards in question are located in a 7-slot remote rack over controlnet. While there is plenty of useful information available on the IF16, I have not come across any details on this specific issue in other discussions. Any insights or assistance would be greatly appreciated. Thank you.

Top Replies

Processors below version 20 are not supported.

jstolaruk mentioned that there is no compatibility for processors below version 20. Thank you for sharing this valuable information.

From my understanding, the 1756-IF16/B module should work just fine with the 1756-L1 5550 processor. I've operated this combination without encountering any compatibility issues. However, the error code you're experiencing seems to refer to a configuration problem. Ensure that your module is set to the correct mode and that all wiring and connections are properly configured. It's also a good idea to verify the firmware versions, as mismatched or outdated firmware can cause these types of errors. Your thought of acquiring a spare 1756-L71 5570 processor may be beneficial as it offers more memory and faster processing.

I agree with your plan to acquire a spare 1756-L71 5570 processor. This module is indeed compatible with the 1756-L1 5550 processor according to Rockwell's compatibility matrix, so error 16#0130 might be unrelated to the compatibility issue. It could be a configuration error or potentially an issue with the ControlNet network. I suggest checking the network integrity and node addressing next. Another thing you might want to consider is to ensure that the revision of your existing 1756-IF16/B card is compatible with your L1 processor. It's often overlooked, but the small details can sometimes make a big difference. Keep us posted on your progress and remember, when you run into problems, the wider community is always here to help.

It sounds like you've done thorough homework on the situation. In general, the 1756-IF16/B module should be compatible with your 1756-L1 5550 processor, but there could be other factors at play causing the error 16#0130. It could be related to a potential firmware mismatch or misconfigured setup. I would recommend double-checking the firmware versions and making sure the IF16 is properly configured in RSlogix5000. Consider borrowing a known working IF16/B module for a quick swap check too, if possible. I hope this helps a bit, and I wish a fruitful troubleshooting process ahead.

Hey! I can understand how frustrating it is to troubleshoot compatibility issues, especially with limited downtime. The 1756-IF16/B module is generally compatible with the 1756-L1 processor, but some specific firmware versions might have quirks that lead to errors like 16#0130. It might help to check if your current firmware on both the processor and the module are up to date, as mismatched versions could cause issues. Also, the suggestion of getting a 1756-L71 processor does sound like a solid plan; it might provide better performance and compatibility overall. Good luck with your investigation tomorrow!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Is the 1756-IF16/B module compatible with the 1756-L1 5550 processor?

Answer: - According to Rockwell's compatibility checkers, there should not be any compatibility issues between the 1756-IF16/B module and the 1756-L1 5550 processor.

FAQ: 2. What does error 160130 indicate when using the 1756-IF16/B module with the 1756-L1 5550 processor?

Answer: - Error 160130 indicates a fault with the cards. It might be necessary to investigate further to determine the root cause of the issue.

FAQ: 3. Is upgrading to a spare 1756-L71 5570 processor a recommended solution for resolving compatibility issues?

Answer: - Considering upgrading to a spare 1756-L71 5570 processor could potentially resolve any compatibility issues between the 1756-IF16/B module and the processor.

FAQ: 4. Are there any specific considerations when using the 1756-IF16/B module in a 7-slot remote rack over controlnet?

Answer: - While there is no specific information mentioned in the discussion, it's advised to ensure proper configuration and compatibility with the setup to avoid any issues.

FAQ: 5. Where can I find more information on troubleshooting compatibility issues with the 1756-IF16/B module and processors?

Answer: - It's recommended to refer to Rockwell's official documentation, manuals, or reach out to their technical support for detailed troubleshooting guidance related

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →