Troubleshooting 1756-OB32 DC Output Card Not Activating Outputs

Question:

The PLC program is not activating the outputs when power is applied. The card is receiving 24 volts and is connected to a common wire.

Top Replies

Are you referring to the subroutine where the output is being scanned or called? It's important to specify the PLC being used. If it's an Allen-Bradley (AB) PLC, is there a Jump to Subroutine (JSR) assigned to call this specific subroutine?

Please provide specific information about the wiring configuration. The diagrams indicate two connection points for the +24 voltage and two connection points for the common, all sourced from the same power supply.

If your PLC program is not activating outputs when powered, check the wiring connections between the output card and your devices. Confirm that the wires are securely attached and properly connected, including the common wire. Make sure the common wire is correctly linked to the designated terminals to resolve this issue effectively.

If your outputs are not functioning, check for voltage at the output even if the light indicates that the output is active.

It sounds like you've covered the basics with ensuring adequate power supply and correct wiring. You might want to double check whether your PLC program is loaded correctly or not, sometimes that can be the issue. Another potential problem could be with the output device itself. Try to test the device separately, or try a different output slot. If none of these work, it may be time to consider the possibility of a faulty output card.

The issue could potentially be a programming fault or a hardware glitch. Check if your programming logic matches the real-world scenarios and that it allows the outputs to be activated. You should also examine the Output module closely; any loose connections or signs of wear & tear? Lastly, ensure that the power supply is not fluctuating and meets the required norms. Any discrepancies may impede the functioning of the PLC program.

It sounds like you've verified power to the PLC card, which is a great start! Have you checked the programming logic to ensure that the conditions for activating the outputs are met? Sometimes a simple oversight, like an incorrect address or a missing condition in the code, can prevent the outputs from triggering. Also, if available, consider using the PLC's diagnostic tools to see if there are any fault codes or issues with the inputs.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Why are the outputs of my 1756-OB32 DC Output Card not activating when power is applied?

Answer: - The outputs may not be activating due to issues in the PLC program or configuration settings. Check the program logic and ensure it is correctly programmed to activate the outputs when required.

FAQ: 2. What should I do if the card is receiving 24 volts but the outputs are not activating?

Answer: - If the card is receiving the correct voltage but the outputs are not activating, check the wiring connections to ensure they are properly connected. Also, verify that the common wire is correctly connected to the card.

FAQ: 3. How can I troubleshoot the activation issue of the outputs on the 1756-OB32 DC Output Card?

Answer: - To troubleshoot the activation issue, you can start by checking the program logic, verifying the input signals to the card, ensuring the wiring connections are secure, and confirming that the card is properly configured in the PLC system.

FAQ: 4. Could incorrect programming or configuration settings be causing the outputs not to activate on the 1756-OB32 DC Output Card?

Answer: - Yes, incorrect programming or configuration settings in the PLC program can prevent the outputs from activating. Double-check the program logic and configuration settings to ensure they are set up correctly for the desired output activation.