Hello everyone, I’m encountering an issue with the S7-300's 64 KB micro memory card (6ES7953-8LF20-0AA0) on one of my machines, which has unfortunately become defective. Although I've performed an MMC reset, the problem persists. To resolve this, I plan to replace it with a new memory card. I have a spare 128 KB card (6ES7953-8LG20-0AA0) ready for use. I’ve successfully backed up my project, but I would appreciate a detailed step-by-step guide on how to configure the new memory card. Additionally, I would like to confirm if the 128 KB memory card is compatible with my CPU. Thank you!
If you are utilizing STEP 7 V5.x with SIMATIC Manager, follow these straightforward steps to download your project effectively: 1. Launch SIMATIC Manager. 2. Navigate to the File menu and select “Retrieve” to begin the process. 3. Access the “Set PG/PC Interface” option, then choose your specific device and communication protocol (for example, PC Adapter (MPI)). 4. Once your project is open, identify and click on the Station (PLC) you wish to download your configuration to. 5. Click on the download icon to initiate the transfer. 6. Select “Accessible Nodes” and ensure that you have the correct address for your PLC selected. By following these steps, you can efficiently manage your project downloads in STEP 7 V5.x.
✅ Work Order Management
✅ Asset Tracking
✅ Preventive Maintenance
✅ Inspection Report
We have received your information. We will share Schedule Demo details on your Mail Id.
Answer: 1. Backup the Project: Ensure that you have a complete backup of your project data from the defective memory card. 2. Insert the New Card: Power down the CPU and insert the new 128 KB memory card into the MMC slot. 3. Power Up and Initialize: Power up the CPU. The CPU should recognize the new card and initialize it. 4. Download Project: Use your programming software (such as STEP 7) to download the backup project onto the new memory card. 5. Test the System: Once the project is downloaded, test
Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.