Troubleshooting Boot Issue and Firmware Version on PanelView Plus_6 1500

Question:

Hey everyone, I'm a newbie on this forum and I need some help troubleshooting a boot issue with my PanelView Plus_6 1500. When we try to edit a .mer file, we're unsure of the firmware version. The boot screen shows "APP 08.00" - does this mean the PVP firmware version is "08.00"? Also, is there a compact flash card located on the logic board of the PVP? Any help is greatly appreciated. Thanks!

Top Replies

When seeking help on technical forums, it is always recommended to provide the full catalog number of your product. This enables other members to offer more precise solutions to your queries. One common question that arises is how to access the Maintenance mode/configuration screen on the PanelView Plus 6 with catalog number 119811. This information is important for users of all levels, from beginners to experts. Another frequently asked question pertains to activating the white square feature on the PanelView Plus 6 or 7, identified by catalog number 494844. This setting is accessible to all users and can be easily enabled for improved functionality. Development for these applications was done using FactoryTalk View Studio v8.00, but it is important to note that the firmware revision of the terminal may vary. To check the firmware revision, simply access Configuration Mode. It is worth mentioning that the PanelView Plus 6 and above logic modules differ from their predecessors, with fixed on-board memory capacities. The 400/600 models come with 256MB RAM and 512MB Storage (NVRAM), while the 700-1500 models feature 512MB RAM and 512MB Storage (NVRAM). These memory capacities are not expandable, but they are designed to meet the needs of various applications. For any further inquiries or assistance, please do not hesitate to reach out. Warm regards, George

Thank you so much for your reply! We utilize FactoryTalk View Studio ME 8.10 for editing the PanelView Plus 6 1500 interface.

Experiencing sticker shock? Selecting the right catalog number from the labels on terminals can be a bit confusing. The key label to quote for the entire terminal is the Assembled Terminal one. The code breakdown is as follows: 2711P-T15C4A8. In this code, 2711P stands for PanelView Plus 6, T15 represents the 1500 Touch Screen, C4 indicates Communications Option Ethernet & RS-232, A signifies AC Power Supply, and 8 denotes Windows CE 6.0 Standard. The other catalog numbers are specific to the Display Module and Logic Model components. Only reference these if you are working with those components individually. Regards, George.

An APP version of 8.00 indicates that it is the FTView ME 8.0 edition.

Thank you for sharing valuable information and insights! Your input is greatly appreciated.

Welcome to the forum! The "APP 08.00" appearing on your boot screen does indeed indicate that your PanelView Plus 6 1500 is operating on firmware version "08.00". As for your second question, yes, there’s typically a compact flash card located on the logic module of the PVP. It won't be directly on the motherboard but rather inserted into a slot on the logic module. If you have further questions or issues, don't hesitate to ask.

Hello and welcome to the forum! You're spot on, "APP 08.00" indicates the firmware version of your PanelView Plus_6 1500, which in this case is indeed version "08.00". As for your second question, yes, there is indeed a compact flash card on the logic board of the PVP. It's usually found in a slot just behind the front panel. Remember, before tampering with it, always power down your device for safety. Let me know if you need any more help!

Welcome to the forum! Yes, the "APP 08.00" on the boot screen typically indicates that your PanelView Plus 6 is running firmware version 8.00. If you're looking to edit a .mer file, just make sure that your editing software is compatible with that firmware version. As for the compact flash card, it should be located on the logic board, so you might want to check there if you're troubleshooting storage or file issues. Good luck, and feel free to ask more questions!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. How can I troubleshoot a boot issue with my PanelView Plus_6 1500?

Answer: To troubleshoot a boot issue, you can try resetting the PanelView Plus_6 1500, checking the connections, ensuring proper power supply, and updating the firmware if needed.

FAQ: 2. How can I determine the firmware version of my PanelView Plus_6 1500?

Answer: The firmware version of the PanelView Plus_6 1500 can be identified by checking the information displayed on the boot screen. For example, "APP 08.00" indicates the firmware version is "08.00".

FAQ: 3. Does the PanelView Plus_6 1500 have a compact flash card located on the logic board?

Answer: Yes, the PanelView Plus_6 1500 may have a compact flash card located on the logic board. It is used for storing application files and data.

FAQ: 4. How can I edit a .mer file on the PanelView Plus_6 1500?

Answer: To edit a .mer file on the PanelView Plus_6 1500, you will need to use the FactoryTalk View Studio software. Open the .mer file in the software to make the necessary modifications.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →