Troubleshooting BootP Disabling on AB ArmorBlock IO 1732ES-IB16 Series A Block

Question:

Greetings everyone, I am encountering difficulties with disabling bootp on my 1732ES-IB16 Series A block despite my attempts using various methods. I have utilized both the old bootp tool from rockwell and the new eip addressing tool, as well as tried using rslinx classic and logix5000. However, I consistently receive a set attribute error from the module when attempting to disable bootp or manually set the IP address. Furthermore, Logix5000 simply closes out of module properties when I try to apply changes in run mode. I am currently operating on a 192.168.1 network and have resorted to manually setting the rotary switches. I am puzzled as to why I am unable to set the attribute regardless of the method used. I wonder if this issue is related to the fact that it is a safety block rather than regular IO. The firmware is up to date at version 1.012 from Rockwell. Despite my efforts, I have not been able to find all the rotary switch options for this specific module. I initially received the module with the rotary switches set to 999, which allowed me to set the IP address without any issues. However, navigating Rockwell's manuals has led me in circles between the specific product manual and their general Ethernet manual. If anyone has specific questions about settings, I am more than willing to provide pictures for clarification.

Top Replies

I have not yet had the opportunity to utilize these devices, but I am aware that some of them come equipped with rotary switches that offer various settings for different addressing modes, including the option to set factory defaults. Can the manual provide more information on this feature?

Joseph_e2 inquired about the rotary switches on devices, which have specific settings for different addressing modes and factory defaults. Have these been mentioned in the manual? I am currently searching for this information. The manual only explains setting the last octet, not all the other options. The devices were originally set at 999, but I was able to set an IP address, leading me to believe this was correct. There may be another setting to configure an IP address and disable DHCP, but I have yet to find it.

As per the user manual, this device is only compatible with DHCP protocol.

Cheeseface noted that the device manual specifies DHCP as the only supported method. The manual also mentions that DHCP is not enabled, and the device retrieves its IP address from non-volatile memory. This aligns with my desired configuration for the device.

For more detailed information beyond the manual (TechConnect Access Level), there is a helpful tech note available. In essence, performing a factory reset involves setting the device to 888, powering off, then on for a minimum of 60 seconds. For DHCP configuration, the setting is 999. Assigning a number between 0-254 will establish an IP address of 192.168.1.xxx, though disabling DHCP may not be supported when set to 999. To experiment, one can try using Boot/P to set the IP and then adjusting the rotary switches to a different value (excluding 888, 999, or 0-254) before power cycling to check if the setting holds. Additionally, there are two important notes to consider. Firstly, failing to leave the device powered on for 60 seconds after setting it to 888 could result in it becoming inoperable. Secondly, if the device is configured in a GuardLogix processor, it must be inhibited before implementing any changes. Disconnecting it from the PLC's network should suffice, although further clarification may be needed on this aspect.

Hi there, Your issue does seem perplexing. One possible explanation could be that the module is in a mode that prevents changes to the IP address. Also, even though you've updated the firmware, there might still be underlying compatibility issues. Without detailed error messages, it can be difficult to pinpoint the problem. As for rotary switch options, the setting "999" should essentially turn off the rotary switches' effect on addressing, allowing you to modify the IP address. However, without a comprehensive guide for this specific module, it's certainly a challenge. You might want to reach out to Rockwell's support directly if you haven't done so already--they should be able to provide more specific guidance. Also, if you could provide pictures of the error messages you're receiving and the settings you're trying to change, that could help identify potential solutions.

Hi there, I faced a similar issue with a 1732ES-IB16 Series A block and disabling bootp before. It turns out it was indeed an issue related to its being a safety block. In particular, the issue seemed to lie in the safety protocol layer, but unfortunately, I never came to a definite solution for this, safety blocks tend to be more delicate when it comes to these things. However, I advise you to reach out to Rockwell support directly, as they were pretty helpful in diagnosing the problem. As for the rotary switch options, I found this resource (link here) to be quite useful, hopefully it will shed some light for you too. Make sure to keep us posted on your progress, and good luck!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Why am I encountering difficulties disabling bootp on my 1732ES-IB16 Series A block despite using various methods?

Answer: - The issue could be related to the module being a safety block rather than regular IO. Additionally, ensure that the firmware is up to date at version 1.012 from Rockwell.

FAQ: 2. Why do I consistently receive a set attribute error when attempting to disable bootp or manually set the IP address?

Answer: - This error could be due to a specific configuration or compatibility issue with the tools being used. Double-check the steps followed and consider seeking support from Rockwell's technical resources.

FAQ: 3. Why does Logix5000 close out of module properties when trying to apply changes in run mode?

Answer: - Closing out of module properties in Logix5000 could indicate a potential software issue or conflict. Try troubleshooting the software or seek assistance from Rockwell's support team.

FAQ: 4. Where can I find all the rotary switch options for the 1732ES-IB16 Series A block?

Answer: - Finding all the rotary switch options for this module can be confusing. Consider reaching out to Rockwell's technical support for specific guidance or clarification on the settings.

FAQ: 5. How can I manually set the IP address for the 1732ES-IB16 Series A block if I am unable to disable bootp?

Answer: - If disabling bootp is not working, manually setting the IP address by

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →