Troubleshooting CJ1M Connection Issue with CX-Programmer 9.82

Question:

Greetings everyone. I have a CJ1M CPU13 that we are attempting to establish communication with using a CS1W-CN226 cable and a USB-Serial converter. We have one computer running version 9.81 and another running version 9.82 of CX-Programmer. The computer with version 9.81 is able to connect to the CJ1M without any issues, but encounters problems with certain USB connections. The issue arose when we upgraded one of the computers to CX-Programmer 9.82. Despite using the same connection settings as the computer running version 9.81, it is unable to establish a connection with the CJ1M. As a newbie to CX-Programmer, I am wondering if there is a misconfiguration in the settings causing this issue.

Top Replies

When working on the same CX Programmer project, it is important to ensure that the serial settings match those saved in the project. Be sure to choose the right COM port, as this may vary. If you are confident in your COM port selection but still experiencing issues, it could be due to USB to Serial converter problems on a Windows system. In such cases, a helpful troubleshooting step is to conduct a loop back test. Simply short pins 2 and 3, then enter characters using a terminal emulator such as RealTerm. This can help diagnose and address any serial communication issues you may be encountering.

Hey there! It certainly sounds like you're encountering a frustrating issue. In my experience, some newer versions of software like CX-Programmer can have compatibility problems. Even if you're using the same settings as before, the changes in the software update itself may not gel well with your current equipment or systems. It might be a good idea to check whether there are any known issues with CX-Programmer 9.82 connecting to CJ1M. If this turns out to be the case, you might want to consider reverting back to version 9.81, or hoping for a fix in a future software patch. Hope this insight helps!

Hello! It seems like you're facing a compatibility issue here. The problem might be due to the newer version of CX-Programmer requiring different settings or having a compatibility issue with certain USB-Serial converters. I suggest you first recheck your configuration settings to see if anything might be overlooked. If the problem persists, check the release notes for the newer version of CX-Programmer. They often list any known issues and, sometimes, workarounds. If no luck, reaching out to Omron's support could be helpful. They may have had similar cases and can guide you through.

It sounds like you're dealing with a tricky compatibility issue between the different versions of CX-Programmer and the USB-Serial converter. Sometimes, minor configuration changes might be needed after an upgrade, like checking the COM port settings or ensuring that the correct driver is installed for your USB converter. Another thing to consider is whether the upgrade has changed any default settings or introduced any bugs. Maybe try creating a new project in 9.82 and importing the settings from the 9.81 project to see if that helps. Good luck!

It sounds like a frustrating situation! Given that the connection works perfectly with version 9.81, I’d first recommend double-checking the USB-Serial converter settings on the 9.82 machine, as sometimes these can default to different parameters after an upgrade. Make sure the baud rate, parity, and other configurations match exactly with what you have on the other computer. Also, check if there are any driver updates for your USB-Serial converter that might resolve compatibility issues with the newer CX-Programmer version. If those settings are all correct, it might be worth looking into any release notes or known issues with 9.82 that could relate to communication. Good luck!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. What could be the possible reasons for CX-Programmer 9.82 having trouble establishing a connection with the CJ1M while version 9.81 connects without issues?

Answer: Answer: The issue could be related to compatibility or configuration differences between the two versions of CX-Programmer. It's important to ensure that the settings, drivers, and communication parameters are correctly configured in version 9.82.

FAQ: 2. How can I troubleshoot USB connection problems when using a CS1W-CN226 cable and a USB-Serial converter with the CJ1M CPU13?

Answer: Answer: To troubleshoot USB connection issues, you can try checking the drivers for the USB-Serial converter, verifying the connection settings in CX-Programmer, ensuring the cable is properly connected, and testing the connection with different USB ports on the computer.

FAQ: 3. As a newbie to CX-Programmer, what are some common misconfigurations in settings that could prevent establishing a connection with the CJ1M?

Answer: Answer: New users might encounter issues due to incorrect communication settings, baud rates, parity settings, or port configurations. Double-checking these settings in CX-Programmer and comparing them with the working setup in version 9.81 can help identify potential misconfigurations.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →