Troubleshooting Common-AnalogEdit Active X Control Issue on FTView SE Windows 10 Upgrade

Question:

Having recently upgraded from Windows 7 to 10 and FTView SE from version 8 to 12, I encountered an issue with Common_AnalogEdit not being able to load Active X due to the presence of Microsoft Forms 2.0 TextBox. If you have experienced a similar problem, I would greatly appreciate your assistance. A screenshot has been attached for reference. Thank you in advance for your help. Regards, MJ Lebotse

Top Replies

To ensure compatibility and functionality, transfer the textbox DLL and any related files, such as an OCX, from the system32 directory to your new computer and re-register them. This procedure is commonly required when updating RSView32 on newer Windows operating systems, which may include outdated versions of the Forms DLLs.

Hey MJ Lebotse, I faced a similar issue when upgrading. It seems like this problem might be connected to how Windows 10 handles Active X controls and Microsoft Forms differently than Windows 7. One potential solution I found was to reinstall or repair the Microsoft Office installation on your machine. The Forms 2.0 library is part of this and reinstalling might help freshen up those dependencies. Also, you might need to adjust your security settings to permit Active X controls to load properly. I hope this helps!

Hey MJ, I faced a similar problem when I upgraded my system, and it was indeed tied to the compatibility with ActiveX controls. One quick fix that worked for me was to ensure that all necessary components were properly registered in the Windows Registry after the upgrade. I also found it helpful to run FTView SE as an administrator. If those steps don’t resolve the issue, consider reinstalling the Microsoft Forms library—it can often get messed up during version upgrades. Hope this helps!

Hey MJ, I’ve had a similar issue when upgrading my systems. It seems like the problem with Common_AnalogEdit and Microsoft Forms can stem from compatibility changes in ActiveX controls between versions. One workaround I found helpful was to ensure all your ActiveX components are registered correctly after the upgrade. You might also want to check if you have the latest updates for both FTView SE and your Windows environment, as sometimes patches can solve these compatibility glitches. Hope that helps!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. What is the common issue encountered when upgrading to Windows 10 and FTView SE version 12?

Answer: After upgrading to Windows 10 and FTView SE version 12, users may face an issue with the Common_AnalogEdit Active X control not loading due to conflicts with the Microsoft Forms 2.0 TextBox.

FAQ: 2. How can I resolve the problem of Common_AnalogEdit not loading Active X in FTView SE on Windows 10?

Answer: To resolve the issue, one possible solution is to address the conflict with the Microsoft Forms 2.0 TextBox. Troubleshooting steps may involve adjusting settings, updating software components, or seeking assistance from Rockwell Automation support.

FAQ: 3. Is there a known workaround for the Active X control issue in FTView SE on Windows 10?

Answer: While specific workarounds may vary depending on the system configuration, some users have reported success by modifying settings or configurations related to the Microsoft Forms 2.0 TextBox. Collaborating with other users who have faced similar challenges can also provide valuable insights.

FAQ: 4. How can I seek further assistance if I am unable to resolve the Common-AnalogEdit Active X control problem on FTView SE after upgrading to Windows 10?

Answer: If you are unable to resolve the issue independently, it is recommended to reach out to Rockwell Automation's technical support team for expert guidance

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →