Troubleshooting connectivity issue with Legacy Hydromat Machine controlled by GE 90-30 system using Proficy Machine Edition 8.6

Question:

Hello everyone, I am currently troubleshooting an issue with a Legacy Hydromat machine that is controlled by a GE 90-30 system with a 372 Plus CPU featuring two 10/100mB ports. I have connected my laptop to the machine using an ethernet cable and successfully pinged the device. Despite setting the IP address in the properties window of a blank project created in Proficy Machine Edition 8.6, I am unable to establish an online connection for uploading data from the machine. I suspect that the compatibility issue may lie with my Windows 10 workstation. Can anyone provide insight or suggestions on how to resolve this connectivity problem?

Top Replies

It seems your suspicion is valid. Version 9.5 was officially certified as Windows 10-compatible. When setting up the blank project, did you switch to a CPU372 from the default CPU374 selection? While uncertain if a mismatch could hinder communication, it's worth checking.I have configured the IP address in the properties window as well. To clarify, did you modify the Physical Port setting from COM to Ethernet and input the CPU372's IP address after right-clicking on the target with the CPU372?

I understood the issue with model 364 settings and have corrected it. I will now input the IP address as advised in the right-click menu. Thank you, Steve, I will update you shortly with the outcome.

I believe the issue lies in the compatibility of Windows, thank you for assisting me with this problem.

I've successfully managed to access the internet and transfer files using 90-30 systems on Windows 10 using Proficy 2.2, despite it not being officially endorsed. It's likely that version 8.6 has a unique problem, which I have no experience with. Upgrading to a newer version of Machine Edition or running 8.6 on Windows 7 may yield more favorable outcomes.

Have you experimented with serial data communication via the power supply port? Explore this innovative technology to enhance your system's connectivity and functionality.

From your description, it does sound like it might be a compatibility issue with Windows 10. However, you could also check for any firewall rules or antivirus software that might be blocking the connection. Also, make sure that the drivers for the ethernet port on your laptop are up-to-date. If neither of these seem to be the problem, you might want to try running the Proficy Machine Edition in compatibility mode for an older version of Windows, or consider using a virtual machine.

It seems like you've been very thorough so far, yet the problem persists. Alongside with the compatibility issue, you might want to consider checking the firewall settings on your Windows 10 workstation, as they can sometimes interfere with machine connections. Furthermore, make sure your network configurations in Proficy Machine Edition match your machine settings. It's a bit of a long shot, but in some cases it has been necessary to downgrade the computer's ethernet port speed to 10 Mbps to communicate with some older machines. If software and hardware inspections don't yield any results, you might want to consider reaching out to GE's support team for specialized advice. Hope this helps.

Hi there, you've already performed some great initial troubleshooting. It could indeed be an issue with Windows 10 and the older GE 90-30 system. One thing to try is running Proficy Machine Edition in compatibility mode for an older version of Windows, like 7 or XP. Even with successful pinging, sometimes certain software just doesn't play well with newer operating systems, hence the compatibility setting might offer a workaround. Also, double-check your firewall settings or any other security protocols that might prevent you from establishing a connection. Good luck!

Hey there, it sounds like you've already done a pretty thorough job on the networking side of your problem. The issue might indeed be due to an OS incompatibility, as some older GE equipment might not be fully compatible with Windows 10. One thing you could try is running the Proficy Machine Edition in compatibility mode for an older version of Windows. If that doesn't work, another workaround could be setting up a virtual machine with an older version of Windows. Do ensure that any changes made align with your company's IT guidelines though. Remember to keep your system's security in mind when making these changes.

It sounds like you're on the right track by verifying the ping, but have you checked the network settings on your Windows 10 machine? Sometimes, Windows Firewall or antivirus settings can block certain ports or applications from communicating properly, so it might be worth temporarily disabling those to see if that resolves the issue. Additionally, double-check that you've set the correct IP configuration in your project and ensure that there are no IP conflicts in your network. If everything else fails, it might help to try connecting via a different Ethernet cable or port on the switch, just to rule out hardware issues. Good luck!

It sounds like you're on the right track by pinging the device, which indicates that the basic network connection is working. One potential issue could be related to the IP address settings; make sure that your laptop's IP address is in the same subnet as the GE 90-30 to avoid any conflicts. Additionally, check the firewall settings on your Windows 10 machine to ensure Proficy Machine Edition has the appropriate permissions to access the network. Lastly, sometimes older software versions have quirks with newer operating systems, so if you haven't already, try running Proficy in compatibility mode for an earlier version of Windows. Good luck!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. How can I troubleshoot connectivity issues between a Legacy Hydromat machine and a GE 90-30 system using Proficy Machine Edition 8.6?

Answer: First, ensure proper physical connection via ethernet cable and check if you can ping the device successfully. Verify IP address settings in Proficy Machine Edition 8.6 and ensure compatibility with your Windows 10 workstation.

FAQ: 2. I have set the IP address in Proficy Machine Edition 8.6, but still cannot establish an online connection with the machine. What could be the possible reasons for this issue?

Answer: Check for any firewall or antivirus settings blocking the connection. Ensure the correct IP configuration and network settings are used. Verify compatibility between the software versions and the operating system.

FAQ: 3. What steps can I take to resolve compatibility issues between a Windows 10 workstation and a Legacy Hydromat machine controlled by a GE 90-30 system?

Answer: Update the necessary drivers for the communication ports on the Windows 10 workstation. Ensure that the software versions and firmware of the machine are compatible with the operating system. Consider using compatibility mode or virtual machines if needed.

FAQ: 4. I suspect a compatibility issue between my Windows 10 workstation and the Legacy Hydromat machine. How can I further diagnose and troubleshoot this problem?

Answer: Try connecting the machine to a

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →