Troubleshooting display problems on GE FANUC IC5002 PanelPC

Question:

Hello! I'm reaching out for assistance with our GE FANUC IC5002 PanelPC. After experiencing difficulties reinstalling Windows XP due to a failed hard drive, I have successfully completed the installation. However, I am facing issues with what appears to be missing VGA or chipset drivers. The image attached shows the current display problem. I have already installed Cimplicity software and the Elo touchscreen, but the display issue persists. Any guidance or advice on how to resolve this issue would be greatly appreciated. Thank you.

Top Replies

Although I have successfully calibrated the colors on the screen, unfortunately, it never extends to full width and the height is consistently too large to fit properly on the screen. This issue persists even during boot up, such as when viewing the award BIOS screens.

From the image you've attached, it indeed looks like an issue with the graphic drivers. Initially, I'd suggest checking the GE FANUC official website for their available drivers, specifically those for the IC5002 PanelPC you are using. If you can't find what you need there, you could try a driver update tool, such as DriverPack Solution, which automatically selects and installs the necessary drivers. Don't forget to reboot your system after installing new drivers, sometimes that step is crucial. Lastly, if you're still facing issues, it might be worth getting in touch directly with GE FANUC's technical support team - sometimes these issues require a more personalized approach. Do let us know how it goes.

It sounds like you're on the right track in thinking this could be a VGA or chipset driver issue. Have you visited the GE FANUC's official website to check if there are relevant drivers available for your specific PanelPC model? If you can't find it there, another good resource for drivers is manufacturer-specific sites or certain trusted third-party sites like DriverGuide. Just ensure you're downloading from a reliable source. Also, double-check the BIOS settings; sometimes a simple adjustment there can fix graphics problems. Good luck!

Hey there! It sounds like you're on the right track with the installation, but the display issue can definitely be frustrating. Have you tried checking the GE FANUC website for the specific VGA or chipset drivers for your PanelPC model? Sometimes, older hardware like this can have compatibility quirks, so it might help to look for legacy drivers as well. Also, ensure that Windows XP has all the necessary updates installed, as they can sometimes resolve driver-related issues. If all else fails, consider reaching out to GE FANUC support— they might have more tailored solutions for your specific setup. Good luck!

Hey there! It sounds like you're off to a good start with the installation, but those display issues can be frustrating. Since it seems like you're missing VGA or chipset drivers, I recommend checking the GE FANUC support site for any specific drivers related to your PanelPC model. Sometimes, downloading the latest graphics driver from the manufacturer’s website or even performing a Windows Update can help detect missing components. Also, if you still have access to the old hard drive, you might be able to pull the drivers from there. Good luck, and I hope you get it sorted out soon!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. What are some common causes of display problems on GE FANUC IC5002 PanelPC?

Answer: Answer: Common causes include missing VGA or chipset drivers, software compatibility issues, hardware malfunctions, or incorrect display settings.

FAQ: 2. How can I troubleshoot missing VGA or chipset drivers on the GE FANUC IC5002 PanelPC?

Answer: Answer: To troubleshoot missing drivers, you can check the device manager for any unrecognized or yellow-marked devices, visit the manufacturer's website to download and install the appropriate drivers, or use driver update tools for automatic detection and installation.

FAQ: 3. What steps can be taken to resolve display issues after reinstalling Windows XP on the GE FANUC IC5002 PanelPC?

Answer: Answer: Steps to resolve display issues may include ensuring all necessary drivers are installed, adjusting display settings, updating the operating system, checking for software conflicts, or contacting technical support for assistance.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →