Troubleshooting Error 585 Level 4 in ProWorx on Modicon Quantum 434 - Seeking Advice

Question:

Hello everyone, I'm seeking assistance with setting up a Quanitum for development purposes. The model number is 140 CPU 434 12U. However, we are encountering an error message (585 Level 4 in ProWorx) when attempting to download files to it. Is this issue related to firmware? As someone with limited experience working with Modicon products, any advice or guidance would be greatly valued.

Top Replies

After experimenting with it today, it appears that ProWorx 32 is having trouble with the latest firmware, incorrectly identifying the PLC as a 584. I have been searching for the Unity to Concept intermediate OS to enable me to downgrade the firmware without success. Does anyone have access to the "Unity_to_Concept_43412A_pvget16.bin" file? I have checked Schneider's website but have been unable to locate it or any other versions of it. Although I have the older firmware bin files, I am unable to find the intermediate OS required for the downgrade.

This location is currently closed. I successfully retrieved the mentioned file from Schneider Electric.

That error could potentially be a firmware-related issue, but it's not necessarily the only cause. It may also be a consequence of a communication issue between your programming device and the Quantum PLC, so it might be worth checking your connections and settings before tinkering with the firmware. The user manual for your model provides a good starting point on how to troubleshoot potential communication issues. Remember, you can also seek professional assistance if you continue to encounter this error as updating firmware can be a complicated task without the proper experience.

Hey there, it does seem like you're dealing with a firmware issue. Error 585 generally indicates a mismatch between the firmware of your Quantum CPU and the firmware version that the ProWorx software is configured to work with. I'd recommend checking the version of your CPU firmware and compare it with what's required for ProWorx. You might need to update either the CPU firmware or configure ProWorx to a compatible firmware version. Also, Modicon Support is quite helpful in such scenarios, so don't hesitate to reach out to them if you need further guidance.

Hey there! It sounds like you’re dealing with a frustrating issue. Error 585 Level 4 in ProWorx often indicates a problem related to communication settings or firmware mismatches. It’s a good idea to double-check if the firmware on your Quantum CPU is compatible with the version of ProWorx you're using. Sometimes, simply updating the firmware can resolve these issues. Additionally, ensure that your cable connections and configurations are set correctly. If you haven’t already, consulting the Modicon documentation related to your specific model might provide some helpful troubleshooting tips as well. Good luck!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. Q: What does error 585 Level 4 in ProWorx on Modicon Quantum 434 indicate? Error 585 Level 4 in ProWorx on Modicon Quantum 434 typically signifies a specific issue related to the programming environment or the communication setup between the software and the PLC.

FAQ: 2. Could the error message be caused by firmware compatibility issues?

Answer: Firmware compatibility issues could indeed be a factor leading to error 585 Level 4 in ProWorx on Modicon Quantum 434. It's advisable to check if the firmware versions of the PLC and the programming software are compatible.

FAQ: 3. Any recommendations for troubleshooting error 585 Level 4 in ProWorx on Modicon Quantum 434 for someone with limited experience in working with Modicon products?

Answer: For troubleshooting this error, it's recommended to check the communication settings, verify the program file integrity, and ensure proper connection between the programming software and the PLC. Seeking assistance from experienced colleagues or Modicon support may also be beneficial.