Troubleshooting error 6133-800429b5 when saving image to SD card from Allen Bradley PLC

Question:

While attempting to store an image onto an SD card from the Allen Bradley PLC in program mode, an error 6133-800429b5 is encountered, along with a message indicating a timeline error has occurred (internal error).

Top Replies

Welcome to the PLCTalk forum community! When using Studio 5000, a reminder will pop up indicating that the controller will go offline during the SD card image save process. Be patient as the controller lights stop blinking before going back online. It is important to ensure that the controller completes the storage process. By adding notes to the Store, you can later reference the time/date of the action and any associated notes in the Nonvolatile Memory tab. In the event of a controller fault, check the Major Faults tab for relevant information. If you encounter a specific error code that is not in the RA Knowledgebase, further troubleshooting may be required.

Welcome to the PLCTalk forum community! Typically, Studio 5000 will prompt you that the controller will go offline while saving the image to the SD card, and it does so gracefully. Wait for the controller lights to stop blinking before going back online. Do you confirm if the storage process is completed? By adding notes to the Store, you can later check the timestamp and associated notes in the Nonvolatile Memory tab. If the controller faults, go online and check the Major Faults tab for information. Unfortunately, the specific error code mentioned does not appear in the RA Knowledgebase. When attempting to store the image on the SD card, a warning message may appear prompting you to proceed. If an error occurs with a timeline error message, check the bottom left corner for the error code displayed.

I haven't encountered that error before. It could be due to a formatting issue with the SD card. Have you installed any apps on the SD card? Try inserting the card into a computer and reformatting it, but make sure to back up any important data first. Is this the original SD card that came with the controller or a third-party one? If it's a third-party card, what is the storage capacity? Also, which controller are you using with the SD card? Some controllers have limitations with high capacity cards.

Operaghost mentioned encountering an error that I had never seen before. I suspect it may be due to a formatting issue with the SD card. Have you installed any applications on the SD card? You could try inserting the card into a computer and reformatting it, but be sure to back up any important data first. Is this the original SD card that came with the controller, or is it a third-party card? If it's a third-party card, what is the capacity and what controller are you using? Some controllers have limitations with high-capacity cards. I attempted to recreate the issue to provide screenshots, but the image loaded onto the SD card without any problems. It's a bit perplexing! I have another similar issue that I will try to capture in a picture later. I have not been able to find any information online regarding this error message or anyone familiar with it.

It sounds like you're dealing with a tricky issue there! Error 6133-800429b5 can be a bit of a head-scratcher, but it often relates to timing problems or memory access inconsistencies. Have you checked that your SD card is properly formatted and compatible with the PLC? Also, ensuring that you're not hitting any size limits on the image or that there aren't any other tasks running that might interfere with the process could help resolve the timeline error. Sometimes, running a firmware update on the PLC can also help clear out these internal hiccups. Good luck!

It sounds frustrating to encounter that error while trying to store an image! The 6133-800429b5 error usually hints at a problem with file handling or memory allocation issues on the SD card. I’d recommend checking if the SD card is formatted correctly and has enough free space, as well as ensuring that you’re not exceeding any file size limits. If everything looks good, a reset of the PLC might help clear any temporary glitches causing the timeline error. Have you tried any of those troubleshooting steps yet?

It sounds like you're running into a frustrating issue with the PLC's ability to handle file operations. Error 6133-800429b5 often indicates problems with memory allocation or file handling, especially in program mode. I would recommend checking if the SD card is formatted correctly and verifying that there’s sufficient free space. Additionally, make sure that any required permissions or settings are properly configured in your PLC’s project. If all else fails, consider updating the firmware or reaching out to Rockwell support for more targeted troubleshooting. Good luck!

It sounds frustrating to hit that error while trying to save an image to the SD card! From what I’ve seen, error code 6133-800429b5 often relates to communication or timing issues between the PLC and the SD card. Have you tried formatting the SD card again or using a different card? It might also help to check the firmware version of your PLC to ensure it’s up to date, as sometimes bugs like this get resolved in newer updates.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. What does error code 6133-800429b5 signify when saving an image to an SD card from an Allen Bradley PLC?

Answer: Answer: Error code 6133-800429b5 indicates a timeline error has occurred (internal error) while attempting to save an image to an SD card from an Allen Bradley PLC in program mode.

FAQ: 2. How can I troubleshoot error 6133-800429b5 on an Allen Bradley PLC when saving an image to an SD card?

Answer: Answer: To troubleshoot error 6133-800429b5, you can try checking the connections between the PLC and the SD card, ensuring the compatibility of the SD card with the PLC, and verifying the program mode settings.

FAQ: 3. Are there specific steps or settings to consider to avoid encountering error 6133-800429b5 when saving images to an SD card from an Allen Bradley PLC?

Answer: Answer: Yes, it is recommended to double-check the write permissions on the SD card, verify the file format of the image being saved, and review the program logic in the PLC for any potential issues causing the timeline error.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →