Troubleshooting error code 0x80004005 in replicating HMI Project on Factory Talk View SE

Question:

Hello everyone, I am currently experiencing an error while attempting to replicate my HMI Project on Factory Talk View SE. The error code I am encountering is 0x80004005. This issue is occurring on Windows Server 2016 Standard with Factory Talk View Studio Version 11. The full error message reads: "Failure during replication of HMI Project from HMI Server [HMI Project name] on Computer [Primary server] to computer [Secondary Server]. Cause: An Unknown error has occurred on Computer [Primary Server] with code=0x80004005." If anyone has encountered this error before and found a resolution, please share your insights. Thank you for your assistance.

Top Replies

umang2097 asked for assistance regarding an error encountered while replicating an HMI Project on Factory Talk View SE. The error code 0x80004005 appeared during the replication process on Windows Server 2016 Standard with Factory Talk View Studio Version 11. The full error message stated: "Failure during replication of HMI Project from HMI Server [HMI Project name] on Computer [Primary server] to computer [Secondary Server]. Cause: An Unknown error has occurred on Computer [Primary Server] with code=0x80004005." If anyone has experienced and resolved this error before, kindly provide guidance. It may potentially be related to a Windows update issue, as Rockwell and Windows compatibility can sometimes be problematic. To fix Windows Error 0x80004005, visit the link shared for further instructions on resolving access denial issues.

Encountering computer issues? Try restarting your system to resolve them. This simple troubleshooting step can often fix common problems that arise during daily use.

It sounds like you're facing a fairly common issue. Error 0x80004005 is often associated with permission issues or a lack of proper communication between the servers. The first thing I'd suggest is checking your DCOM settings on both servers and ensuring that your user account has the necessary permissions to execute the replication. Also, verify that there's no firewall or antivirus software blocking the communication between primary and secondary servers. Lastly, consider updating your Factory Talk View software to the latest version as some old versions might have compatibility issues with Windows Server 2016. Don't lose hope, you'll crack this!

Hi there, I recall encountering a similar issue with Factory Talk View SE some time ago. This error code, 0x80004005, is a general error message that typically indicates an "access denied" situation. It's possible that there could be a network issue or the user account might not have the necessary permissions. You could try to ensure that both servers are in the same domain and check the folder permissions of the FactoryTalk Directory. If the issue persists, I would recommend reaching out to Rockwell Automation support for further assistance. Hope this helps!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. What does error code 0x80004005 mean in Factory Talk View SE replication?

Answer: - Error code 0x80004005 in Factory Talk View SE replication typically indicates an unknown error that occurred during the replication process.

FAQ: 2. How can I troubleshoot error code 0x80004005 in Factory Talk View SE replication?

Answer: - To troubleshoot error code 0x80004005 in Factory Talk View SE replication, you can try checking network connectivity, ensuring proper permissions, verifying software versions compatibility, and reviewing event logs for more specific error details.

FAQ: 3. Is there a common solution for resolving error code 0x80004005 in Factory Talk View SE replication?

Answer: - While specific solutions may vary based on the root cause of the error, common troubleshooting steps include restarting services, validating configurations, updating software patches, and consulting Rockwell Automation support for further assistance.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →