Troubleshooting Invalid Expression in RSLogix 5000 for Calculating Cut Length

Question:

I'm encountering an issue with an invalid expression or tag while trying to perform a specific calculation. Here's what I'm aiming to achieve: I want to calculate the following expression: (Cut_Count[1].ACC multiplied by Read_Data[0] multiplied by 31.5) divided by 144. To clarify: - **Cut_Count[1].ACC** represents the accumulated count from my sheet. - **Read_Data[0]** contains my web width data measured in inches. - **31.5** is my constant cut length in inches. - **144** is used to convert the measurements into square feet. I've experimented with multiple approaches, and I previously had it working correctly, but I mistakenly managed the multiplication and division operations. I believe my tags are correctly formatted, yet I’m not seeing any bracketing errors. Here's the formula I think should work: (31.5 * (Cut_Count[1].ACC * Read_Data[0])) / 144. Can you help me identify what I might be doing wrong? Thank you!

Top Replies

To begin with, it's important to note that while SLC and PLC-5 systems utilize the pipe symbol ('|') as the division operator, ControlLogix adopts the slash symbol ('/') for this purpose. Additionally, let’s examine the data type of your tag, Read_Data. If it is not classified as DINT[x], Real[x], INT[x], or SINT[x], then this discrepancy might be the source of your issues.

I noticed that when I perform the calculation (Read_Data[0] * Cut_Count[1].ACC) * 31.5, it yields the expected results. This leads me to believe that I might be using the incorrect division sign in my formula. I'll test that out. Thank you for your prompt response!

Thank you for your help! I’ve realized that it's a "/" instead of a "|". However, I’m encountering an issue with my RSLogix 5000 software—it appears that the "Instruction Help" feature is missing and has not been downloaded. Does anyone have insights on how to resolve this issue?

It looks like you've got the right idea with your formula, but sometimes invalid expression errors can stem from how you've referenced your data fields. Double-check that there aren’t any typos in your tag names, and ensure that both `Cut_Count[1].ACC` and `Read_Data[0]` are returning expected numeric values. Additionally, depending on the software or platform you’re using, confirm that you're following any specific syntax rules—sometimes additional brackets or different operators might be needed to clarify operations. If it still doesn't work, try breaking it down step-by-step by calculating `Cut_Count[1].ACC * Read_Data[0]` first and then multiplying the result by `31.5` before dividing by `144`. That way, you can pinpoint where things might be going awry. Good luck!

It sounds like you're on the right track with the formula, but sometimes the issues can be a bit tricky to catch. Make sure that both **Cut_Count[1].ACC** and **Read_Data[0]** are returning valid numeric values, as any non-numeric data could definitely trigger that invalid expression error. Also, double-check the data types—if you're using a scripting language, sometimes you have to explicitly convert data types. Lastly, if the environment you're working in allows debug logging, try printing each part of your expression before the full calculation to see where it might be failing. Hang in there; you'll sort it out!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: Answer:

Answer: The calculation is intended to determine a specific measurement in square feet based on the accumulated cut count and web width data. The expression `(Cut_Count[1].ACC Read_Data[0] 31.5) / 144` calculates the total area in square inches and then converts it into square feet by dividing by 144 (since there are 144 square inches in a square foot).

FAQ: Answer:

Answer: Possible causes for an "invalid expression" error include: - Incorrect data types for the tags involved in the calculation. - Syntax errors in the expression, such as missing parentheses or incorrect operator usage. - Incorrect tag names or indices, which could result in RSLogix not recognizing the specified tags.

FAQ: Answer:

Answer: The expression should be structured with proper parentheses to ensure correct order of operations: `(31.5 (Cut_Count[1].ACC Read_Data[0])) /

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →