Troubleshooting Issue with Nordson Hot Glue System: Skipping 4 Hoses and Guns

Question:

Hello everyone, we recently acquired a new Nordson hot glue system with 6 hoses and guns. However, we are encountering an issue where it skips over 4 of them during the cycling process. If anyone has any knowledge or experience with troubleshooting this issue, your assistance would be greatly valued. Could this be due to a setting error?

Top Replies

For a more comprehensive understanding, additional information is required. The Nordson system we utilized featured its own unique operating system. In response to your query, the system settings may have contained the necessary details, although they were somewhat unreliable. If there is a malfunction, the system may not heat up correctly. You should investigate whether someone has disabled gun #4. Our system also included color indicators on the screen to easily determine the status of each gun.

If you have a new equipment and are experiencing issues with sensors detecting parts or potential blockages, it is recommended to reach out to Nordson for assistance. Proper alignment of sensors is crucial for ensuring accurate detection. If there is a problem with a solenoid or blockage, an error message should be generated. It is also important to check if the nozzle is properly enabled as suggested by the manufacturer.

Hi there, I've worked with Nordson systems for a few years. It sounds like the issue might be rooted in your configuration settings. One thing you could check is the individual hose and gun settings to ensure that each one is properly activated. Also, double-check the cycle sequence settings to ensure all six hoses and guns are intended to be used in the cycle. Sometimes, hoses or guns might be unintentionally skipped if they're not included in the cycle sequence. If all else fails, it's good to reach out to Nordson's technical support as well.

Hey there, it definitely sounds like a configuration issue to me. I remember working on a similar Nordson system a few years back and ran into something similar. I'd recommend thoroughly checking your sequence programming. The skipping might occur if the sequence is not set to include all 6 guns. If you can, try running a diagnostic to see if there's any specific error code. That might give you a more precise direction to troubleshoot.

Hey there! I've experienced something similar with our Nordson system before. It's possible that your issue could be due to a programming error; you may want to verify if the system has been correctly set to operate all six guns. It's also worth checking if the four hoses are somehow being blocked or are not hooking up properly. If you continue experiencing this issue, you should reach out to Nordson technical support - they're usually pretty helpful with these kinds of problems. Hope this helps!

Hi there, we've faced a similar issue with our Nordson system before. It sounds like you might be dealing with a programming problem rather than a hardware issue. Double-check if the gun sequencing in the programming settings correctly corresponds with the physical setup. If one of your hoses/guns is set up out of sequence, it could ostensibly skip it during operations. Always make sure the settings reflect the exact configuration of your equipment.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. What could be causing a Nordson hot glue system to skip over hoses and guns during the cycling process?

Answer: Answer: Several factors could contribute to this issue, such as clogs in the hoses, improper settings, air pressure inconsistencies, or mechanical faults in the system.

FAQ: 2. How can I troubleshoot a Nordson hot glue system that is skipping hoses and guns?

Answer: Answer: You can start by checking for any clogs in the hoses, ensuring the settings are correct, verifying the air pressure levels, and inspecting the system for any mechanical issues.

FAQ: 3. Is it possible that the skipping issue with the Nordson hot glue system is due to a setting error?

Answer: Answer: Yes, a setting error could be a possible cause for the system skipping hoses and guns. It is recommended to review and adjust the settings according to the manufacturer's guidelines to troubleshoot this issue.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →