Troubleshooting issues adding CPU312 in TIA Portal v.18

Question:

Greetings everyone. I am currently facing issues with setting up a project for my CPU312 (312-1AE13-0AB0) as I am unable to add the device successfully. Despite the device and article number appearing, selecting it does not seem to progress further. As I am not well-versed in TIA Portal, I believe there may be a step I am overlooking. Although I have turned to resources like YouTube University for help, the tutorials I have watched do not align with the results I am experiencing with TIA Portal v.18 and my specific CPU model. I assume that since my CPU is specifically listed, it should be compatible with this software. The selection I am making is not yielding any results, and I am unsure of what to do next.

Top Replies

I wanted to mention that the software is installed on a virtual machine (VM) alongside Rockwell Software. I'm unsure if they are compatible with each other.

If you're seeing the spinning circle, what comes next? Another thing to attempt is dragging it from the hardware catalog to the network view. Keep us informed.

I gave it a shot with 312 and it actually worked like a charm.

When experiencing the spinning circle issue, try dragging the item from the hardware catalog to the network view. After the spinning circle disappears, you may see a display of 6 gears. To check if the item was successfully added, select "add new device" again with the same name. The system may not allow a duplicate name if the item was indeed created. Let us know if you encounter any further issues.

Who needs six gears anyway? The name is irrelevant, as it will simply lead to the creation of a series of PLC models such as PLC_2, PLC_3, and so on.

Hi there! It sounds like you're dealing with a frustrating issue, but you're on the right track. As you mentioned, your CPU model should indeed be compatible with TIA Portal v.18. One common issue could be that you need to update the hardware catalog in your TIA Portal. Sometimes, the device you see listed might not be completely set up in your current catalog. Try checking for updates, and if available, install them. Also, ensure that your CPU firmware version is compatible with the version of TIA portal you're using. Finally, don't forget to completely reboot your TIA after changes, as minor as they might seem. Those changes often don't take effect until after a reboot. Hope this helps!

Hey there! I had a similar issue not long ago. The problem might be due to firmware compatibility between your CPU and the TIA Portal version you're using. Make sure that the firmware version of your CPU312 is supported by the TIA Portal v.18. If not, you might need to consider downgrading your TIA Portal version or upgrading the firmware of your CPU. Another possible issue could be a faulty or incomplete installation of your TIA software; a reinstall might help. Just make sure to back up your work before you proceed with any changes.

Hey there! It sounds like you’re having a frustrating experience with TIA Portal and your CPU setup. One thing you might want to check is whether you've selected the correct "Project Type" before trying to add the device, as that can sometimes cause issues when integrating specific hardware. Also, ensure that your software is fully updated, as compatibility bugs can occur with new versions. If you haven't already, consider checking the configuration settings and confirming that the CPU is properly powered on and connected. Lastly, the Siemens forums are a great resource for troubleshooting, as other users might have experienced similar issues with that specific version. Good luck!

Hey there! It sounds frustrating to deal with those issues in TIA Portal, especially since you’re using a CPU that’s supposed to be compatible. One thing to check is whether you've installed all the necessary add-ons for your specific CPU model in TIA Portal—sometimes they can be buried in the options. Also, make sure that you're following the proper steps to create a new project before trying to add the device, as missing that could lead to these selection issues. If it continues to be a problem, consider checking out the Siemens forums or their support; they can often provide guidance more tailored to your specific situation. Good luck!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. I am having trouble adding a CPU312 in TIA Portal v18. What steps should I follow to troubleshoot this issue?

Answer: To troubleshoot adding a CPU312 in TIA Portal v18, ensure the device and article number are correctly selected, check for any compatibility issues, and review the configuration process step-by-step.

FAQ: 2. How can I resolve the issue of selecting the CPU312 in TIA Portal v18 but not progressing further?

Answer: If selecting the CPU312 in TIA Portal v18 does not progress further, verify the compatibility of the CPU model with the software version, double-check the configuration settings, and seek guidance from reliable sources or forums for specific troubleshooting steps.

FAQ: 3. Are there specific considerations or settings I need to be aware of when setting up a project for CPU312 (312-1AE13-0AB0) in TIA Portal v18?

Answer: When setting up a project for CPU312 (312-1AE13-0AB0) in TIA Portal v18, ensure compatibility with the software version, validate the device selection process, and seek assistance from experienced users or Siemens support if encountering difficulties.

FAQ: 4. How can I ensure successful integration of my specific CPU model with TIA Portal v18 despite encountering issues during the device selection process?

Answer: To ensure successful integration of your specific CPU model

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →