Troubleshooting Logix Emulate 5000 Controller Version Selection Issue

Question:

Hello everyone, I am new to Rockwell PLC programming and currently in the process of simulating an existing project for debugging purposes. Coming from a background of working with Siemens software for several years, I find the simulation process in Logix Emulate a bit challenging. I am using Studio 5000 version 33.0, Logix Emulate version 33.0, and RS Linx Classic 4.20 CPR 9 SR 12.0 on Windows 7 Professional. The issue I am facing is that when I try to add a simulated 5570 controller in any available slot (ranging from slot 2 to slot 16) in Logix Emulate, the controller version selection appears blank and does not display any options. Upon clicking "next" and then "finish," an error message stating "internal error! failed to install Studio 5000 Logix Emulate in slot!" pops up. This being my first venture into Rockwell programming, I am unsure if I am missing a step or doing something incorrectly. Any guidance or assistance on this matter would be highly appreciated. Thank you.

Top Replies

It seems like the issue could be related to the installation process. Make sure you are able to see various version options (v20 - 33) in the drop-down menu. I recommend trying to reinstall EmulateOG. Additionally, refer to a RA Tech Note which suggests repairing the installation first. If that doesn't work, uninstall and then reinstall the program. To do this, access the Windows registry through REGEDIT and locate the appropriate registry key based on your Windows system (HKEY_LOCAL_MACHINE\Software\Rockwell Automation\VirtualBackplaneMonitor for 32-bit Windows, HKEY_LOCAL_MACHINE\Software\Wow6432Node\Rockwell Automation\VirtualBackplaneMonitor for 64-bit Windows). Delete the VirtualBackplaneMonitor folder from there. Afterward, restart your computer and proceed with the reinstallation process.

Operaghost suggested that the issue may be related to an installation problem. Ideally, you should see various version choices (v20 - 33) in the dropdown menu. I recommend trying to reinstall EmulateOG. Additionally, a RA Tech Note suggests repairing the installation. If that doesn't work, the next step would be to uninstall and then reinstall the software. To do this, navigate to the Windows registry using REGEDIT and modify the appropriate registry key based on your Windows version. For 32-bit Windows, access HKEY_LOCAL_MACHINE\Software\Rockwell Automation\VirtualBackplaneMonitor, and for 64-bit Windows, go to HKEY_LOCAL_MACHINE\Software\Wow6432Node\Rockwell Automation\VirtualBackplaneMonitor. Within the registry, delete the VirtualBackplaneMonitor folder, then reboot and reinstall the software. After following these steps, the issue was resolved for me. Thank you for your assistance.

If you frequently encounter this scenario, stay alert for FactoryTalk Logix Echo as it serves as a suitable alternative to RSLogix 5000 Emulate. This tool addresses many of the issues found in Emulate, although it may not be as user-friendly as Siemens counterparts.

New to Rockwell PLC programming, scalo94 seeks help with simulating an existing project for debugging purposes. Having experience with Siemens software, they are finding Logix Emulate in Studio 5000 version 33.0 challenging. When attempting to add a simulated 5570 controller in Logix Emulate, scalo94 encounters an issue where the controller version is not selectable, resulting in an "internal error" message. Seeking assistance from the community, scalo94 hopes to resolve this problem to successfully debug the project. Can anyone provide assistance or the necessary installer to address this issue?

Hi there! Welcome to the world of Rockwell PLC programming, it can be a bit tricky to get the hang of it when you're just starting out. Regarding your issue, a possible reason for the error could be version mismatch. Ensure you have complete compatibility between your OS, Studio 5000 version, and Emulate versions. Another possibility could be a software installation error, try uninstalling and reinstalling your software. Remember to take a backup before doing so. It's always a bit of a learning curve when you're used to a different software, but with some perseverance, I'm confident you'll get the hang of it!

Welcome to Rockwell programming! It can indeed be quite a transition from Siemens. Your error message suggests a possible compatibility issue. Make sure your Studio 5000 and Logix Emulate versions match your RSLogix 5000 version. Moreover, Windows 7 might be causing issues as Rockwell started phasing out support for it since v28. It's recommended to be on at least Windows 10 now. The bottom line is, if you can, try upgrading your system and also ensure that all your software versions are concurrent. This might resolve the issue. If it doesn't, let us know! We're here to help.

Hey, welcome to the world of Rockwell PLCs! It sounds like you're having a frustrating time with Logix Emulate. One thing you might want to check is whether the proper controller type is licensed and installed in your Studio 5000 software. Sometimes, the blank selection issue can arise if the software doesn’t recognize the controller due to licensing inconsistencies. Additionally, make sure you're running everything with the appropriate permissions; sometimes running these applications as an Administrator can help resolve unexpected errors. If that doesn't resolve the issue, consider reinstalling Logix Emulate to ensure everything is set up correctly. Good luck, and don’t hesitate to reach out if you run into more hurdles!

Welcome to the Rockwell world! It sounds like you're encountering a common hiccup with Logix Emulate. This issue often arises from version mismatches or missing installation components. First, make sure that both Studio 5000 and Logix Emulate are fully compatible; since you're using version 33.0 for both, they should match. Also, have you checked whether your Logix Emulate installation includes all necessary components for the 5570 controller? Sometimes doing a repair installation can resolve these missing files. Additionally, try running the software as an administrator—it can sometimes help with permission issues. If all else fails, checking Rockwell’s forums or reaching out to their tech support might give you more tailored help. Good luck, and don’t hesitate to ask if you hit more bumps along the way!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Why is the controller version selection blank when trying to add a simulated 5570 controller in Logix Emulate?

Answer: Answer: The blank controller version selection issue may be due to a compatibility or configuration mismatch between the software versions being used. Make sure that the Studio 5000, Logix Emulate, and RS Linx Classic versions are all compatible with each other.

FAQ: 2. How can I resolve the "internal error! failed to install Studio 5000 Logix Emulate in slot!" message when adding a controller in Logix Emulate?

Answer: Answer: To resolve this error message, ensure that the software installations are correctly done and that the necessary components are properly configured. Check for any installation errors or conflicts that could be causing the issue.

FAQ: 3. What steps should I take to troubleshoot the controller version selection issue in Logix Emulate for Rockwell PLC programming?

Answer: Answer: Start by verifying the compatibility of the software versions, ensuring proper installation and configuration. You may also want to check for any specific settings or requirements for simulating a controller in Logix Emulate. Consulting the Rockwell Automation documentation or seeking assistance from their support team can also be helpful in troubleshooting the issue.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →