Troubleshooting M258 PLC Firmware Upgrade Issue and Finding Firmware File

Question:

Greetings, I am currently facing an issue with connecting my M258 PLC (firmware: 2.0.31.40) using Somachine v4.3 software. The target PLC is indicating a different version, prompting me to upgrade the firmware to 4.0.3.6. However, I am unable to select the firmware versions as they are not displaying in the controller assistant. Despite searching online, I have been unable to find the necessary firmware file. I am seeking assistance in resolving why the firmware version is not visible in the controller assistant and also in obtaining the firmware file for the M258 PLC. Please refer to the attached photo for further clarification. Thank you.

Top Replies

This PLC offers versatility as it can be programmed with either the M258 or LMC firmware, catering to those in need of a regular PLC or motion firmware. Both the 2.x and 4.x firmware versions are readily available for download on the TM258LF42DT page, designed for a compact base M258 with 42 I/O and 24 V DC compatibility for CANopen connectivity in Indonesia. To access these firmware options, simply scroll down to the bottom of the page. For further information on programming the M258 PLC, refer to the following link: https://product-help.schneider-electric.com/Machine%20Expert/V1.2/en/m258prg/m258prg/M258_-_Transfer/M258_-_Transfer-2.htm. Schneider Electric Indonesia continues to provide innovative solutions for your automation needs.

Riyas Mohamed inquired:Hello everyone, I have a M258 PLC (firmware: 2.0.31.40) and I am using Somachine v4.3 software. I am facing issues connecting my PLC as it is showing that the target PLC is a different version. Therefore, I need to update the firmware of my PLC to 4.0.3.6. I have tried updating the firmware, but I am unable to select the firmware versions as they are not displayed in the controller assistant. Additionally, I have searched online for the firmware file but have been unsuccessful in finding any. Can someone please provide a solution as to why the firmware version is not appearing in the controller assistant? Kindly share the M258 firmware file with me? Photo attached for reference.

Klewerson Miranda confirmed if the issue was resolved. Indeed, after properly installing the software on my machine, the firmware version was finally displayed, resolving the problem. Reinstalling the software was the key to solving the issue.

You may need to install the necessary libraries for the firmware to show up in the controller assistant. Regarding the desired firmware file for M258 PLC, it's not typically available for direct download online due to the company's policy on software updates. However, you may be able to obtain it by directly contacting Schneider Electric's support service or your vendor, as they regularly maintain such updates. Let's hope this is a viable course of action for you.

It sounds like your Somachine software might not be compatible with your current firmware version. Just to confirm, please cross verify if you're using the latest version of Somachine or if a newer version is available which might support firmware 4.0.3.6. For the firmware file, it's generally available on the manufacturer's website under 'Downloads' or 'Support' section. If you can't find it there, you can contact their customer support and they should be able to provide you the necessary file. Additionally, make sure that your controller assistant is properly configured to display available firmware versions for your specific PLC model.

It sounds like you're dealing with a tricky situation! First, make sure that your Somachine software is fully updated, as sometimes firmware compatibility issues can arise from having an outdated version of the software. If the firmware versions aren't showing in the controller assistant, you might also want to double-check your Internet connection or firewall settings, as they can sometimes prevent access to the firmware repository. As for the firmware file itself, you can usually find it on the official Schneider Electric website or contact their support for help; they often have resources for downloading specific firmware versions. Good luck, and I hope you get it sorted out!

It sounds like you're dealing with a frustrating situation! Sometimes, the firmware files can be a bit tricky to find if they're not readily available on the manufacturer's site. Have you tried checking the latest updates on the Schneider Electric support page or reaching out to their customer service? They might be able to provide you with the firmware file directly or guide you on how to make it appear in the controller assistant. Also, consider checking the compatibility settings in SoMachine, as sometimes that can impact what shows up. Good luck!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Why is the firmware version not visible in the controller assistant for the M258 PLC?

Answer: - The firmware version may not be visible due to compatibility issues with the Somachine software or incorrect configuration settings.

FAQ: 2. How can I resolve the issue of firmware version not displaying in the controller assistant for the M258 PLC?

Answer: - You can try checking the software settings, ensuring proper connectivity, and verifying compatibility between the PLC model and the software version.

FAQ: 3. Where can I find the necessary firmware file for upgrading the M258 PLC from version 2.0.31.40 to 4.0.3.6?

Answer: - If you are unable to locate the firmware file online, you may contact the manufacturer or authorized distributors for assistance in obtaining the specific firmware version required for the upgrade.

FAQ: 4. What steps can I take to troubleshoot the M258 PLC firmware upgrade issue?

Answer: - You can try resetting the PLC, checking the communication settings, updating the software, and ensuring proper firmware compatibility to troubleshoot the firmware upgrade issue effectively.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →