Troubleshooting Micro850 controller plugin slot errors

Question:

Hello everyone! I encountered a problem with my controller while testing my program. I discovered that my plugin modules were placed in the wrong slots, so I made changes while the controller was powered on. I'm concerned if this action may have caused damage to the slots. Will all the slots of my controller be affected or just the ones where the plugins were connected?

Top Replies

My colleague's attempt to hotswap an IO module on an 800 series micro resulted in the complete fry-out of the processor, all IO cards, and other components.

tlf30 recounted an incident where a co-worker attempted to hotswap an IO module on an 800 series microcontroller, resulting in damage to the processor and all IO cards. Upon retesting, it was discovered that only the slots where the plugins were inserted were affected, while the other slots remained unaffected and are functioning normally.

Hey there, generally speaking, it's not advisable to switch the plugin modules while the controller is powered up. This is similar to yanking out a USB drive from a laptop without properly ejecting it; it could cause potential harm. However, the damage, if any, would likely be confined to the slots where the plugins were incorrectly installed. I would recommend properly powering down your controller before making such changes to mitigate risks in the future. However, if you're noticing any performance issues with the controller, it might be best to get it diagnosed by a professional.

Hey there! In general, it's a good idea to power off your controller before making any changes to avoid any potential damage or short circuits. However, many modern controllers are equipped with protection circuits to prevent this kind of issue, but the extent of protection varies dramatically from one controller to another. In your case, I'd guess that only the slots where you changed the plugins may be affected, if at all. Nonetheless, thorough testing is required to be certain. Next time, remember to power off to keep your equipment safe!

While it is generally not recommended to change plugin modules while the controller is powered on, it doesn't necessarily equate to having caused damage. The potential damage would likely be confined to the slots where the plugins were connected. That said, it would be wise to run a fault detection test on your controller to ensure everything is operating normally. Remember to power off your controller next time before making such changes to prevent any potential harm. Better safe than sorry, right?

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

To add a comment, please sign in or register if you haven't already..   

Frequently Asked Questions (FAQ)

FAQ: 1. Question: Can placing plugin modules in the wrong slots of a Micro850 controller while it's powered on cause damage?

Answer: Answer: Yes, placing plugin modules in the wrong slots while the controller is powered on can potentially cause damage to the affected slots or even the controller itself. It is recommended to power off the controller before making any changes to the plugin modules.

FAQ: 2. Question: If I placed plugin modules in the wrong slots of my Micro850 controller while it was powered on, will all the slots be affected or just the ones where the plugins were connected?

Answer: Answer: While the slots where the plugins were connected are more likely to be affected, there is a possibility that other slots in the controller may also have been impacted. It's important to thoroughly check all slots for any signs of damage or malfunction.

FAQ: 3. Question: What should I do if I suspect damage to the slots of my Micro850 controller after making changes to the plugin modules while it was powered on?

Answer: Answer: If you suspect damage to the slots of your Micro850 controller, it is recommended to power off the controller immediately and consult the user manual or technical support for guidance on how to proceed with troubleshooting or repairs. It's important to address any potential issues promptly to avoid further damage.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  â†’